Laserfiche WebLink
r � <br /> TELSTAR ENGINEERING, INC. - Page 3 <br /> June 15, 1994 <br /> f. The interim retention pond and temporary drainage system <br /> is shown on the plans per agreement with Mr. Tom Iwamiya. <br /> The applicant will agree to participate financially in <br /> their share of the Storm Drain System to be installed, in <br /> the future, at Walnut Grove Road. <br /> g. The project will: be connected to the sewer treatment <br /> plant to be installed at the Sunnyside Mini-Market, on <br /> the south side of Walnut Grove Road, which will. become a <br /> public sewer system. <br /> h. Public water service will be supplied by San Joaquin <br /> County. <br /> 3. PUBLIC HEALTH SERVICES. <br /> a. The project will. be connected to the proposed sewer <br /> treatment plant at Sunnyside. The plant design is being <br /> done by Rose Engineering. The complete Sewer Plans will <br /> be submitted, shortly, to Mr. Mike Huggins at Health <br /> Services, sufficient for him to send you his memo <br /> clearing his conditions. <br /> b. Mr. Mark Roser is obtaining the discharge requirements <br /> form the California Regional Water Quality Control Board, <br /> • Central Valley Region, and this information will be <br /> turned in to Mr., Mike Huggins, along with the Sewer <br /> Plans. <br /> C. The project will be connected to the existing San Joaquin <br /> Count Water System, and b this letter we are requesting <br /> Y Y Y q g <br /> the County to issue the appropriate "Will-Serve" letter <br /> to Mr. and Mrs. Manser. <br />