Laserfiche WebLink
Mo Hatef -2- <br /> Community Development Department <br /> PA-1400111 (SA) <br /> 3. The proposed project disturbs less than one(1)acre of ground and is not part of a larger plan of common <br /> development. The construction phase of the proposed project shall follow best management practices as may <br /> be appropriate to minimize the discharge and transport of pollutants. (Title 5-Health and Sanitation, Division <br /> 10-Storm Water Management and Discharge Control) <br /> 4. The applicant shall comply with the State Water Resources Control Board General Order No. 97-03-DWQ, <br /> "General Permit for Discharges of Storm Water Associated with Industrial Activities Excluding Construction <br /> Activities". The WDID for the Industrial General Permit issued by SWRCB shall be submitted to Public <br /> Works. <br /> 5. All new construction and the substantial improvement of any structure shall be elevated or flood proofed in <br /> accordance to San Joaquin County Ordinance Code Section 9-1605.12(a), (b) and(c). <br /> Informational Notes: <br /> (i.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building Division of the <br /> Community Development Department prior to issuance of the building permit. Contact the Solid Waste <br /> Division(468-3066)for information. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito& Vector Control District(209- <br /> 982-4675)and the California Health and Safety Code for the prevention of mosquitoes. Best Management <br /> Practices(BMP)guidelines for stormwater devices, ponds and wetlands are available. <br /> (iii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, Chapter 9-1605)and <br /> all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. As <br /> an example, these requirements may include raising the finish floor elevation one foot above the expected <br /> flood level and/or using flood resistant materials. <br /> AC:SC <br /> F:ICOMMENM&4TR 20141PA-1400111(Small[Vinery-Thornton Rd)IPA-1400111.doc <br />