Laserfiche WebLink
RECEIVED <br /> APR qJ G qo's U.S.Department of Homeland Security <br /> 1i L L -FEMA Region IX <br /> San Joaquin County Oakland,CA.94607t-40520 <br /> Community Development <br /> * FEMA <br /> April 12, 2016 <br /> Stephanie Stowers,Project Manager <br /> San Joaquin County, Community Development Department <br /> Development Services Division <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Ms. Stowers: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA-1500242 (MS) Minor subdivision application(APN/Address: 189-160-12, 189- <br /> 160-23, <br /> 89-160-12, 189-160-23, 189-190-04, 189-190-07/15410 South Tracy Boulevard, Stockton) (Supervisorial <br /> District 3). <br /> Please review the current effective countywide Flood Insurance Rate Maps (FIRMS) for the <br /> County of San Joaquin(Community Number 060299) and City of Stockton(Community <br /> Number 060302), Maps revised October 16, 2009. Please note that the City of Stockton, San <br /> Joaquin County, California is a participant in the National Flood Insurance Program (NFIP). The <br /> minimum, basic NFIP floodplain management building requirements are described in Vol. 44 <br /> Code of Federal Regulations (44 CFR), Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain, (i.e., Flood Zones A, AO, AH,AE, <br /> and Al through A30 as delineated on the FIRM), must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM, any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings, other structures, mining, dredging,filling, <br /> grading,paving, excavation or drilling operations,and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed prior to the start of <br /> development, and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> www.fema.gov <br />