Laserfiche WebLink
John L. Funderburg -2- <br /> Community Development Department <br /> PA-1500168 (SA) <br /> 4. The Regional Transportation Impact Fee shall be required for this application. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. The gate shall be set-back 40' from the property line. <br /> 7. The developer shall provide drainage facilities in accordance with the San Joaquin County Development <br /> Standards. Retention basins shall be fenced with six(6) foot high chain link fence or equal when the <br /> maximum design depth is 18 inches or more. Required retention basin capacity shall be calculated and <br /> submitted along with a drainage plan for review and approval,prior to release of building permit. <br /> (Development Title Section 9-1135) <br /> 8. This project falls within the boundaries of the San Joaquin County Phase lI Post-Construction National <br /> Pollutant Discharge Elimination System(NPDES)permit and must meet the following requirements: <br /> a. A registered professional engineer shall design a system or combination of systems to infiltrate,treat, <br /> and/or filter the 85th percentile storm as defined in the County's Post-Construction Standards Manual. <br /> The system design shall follow standards as outlined in the 2009 SWQCCP or in the "California <br /> Association of Stormwater Quality Agencies" (CASQA)publications and comply with the conditions of <br /> the County Phase 11 NPDES permit. CASQA documents-are available at http://www.casga.org <br /> b. Owner shall submit a"Storm Water Pollution Prevention Plan" (SWPPP) to Public Works for review.A <br /> SWPPP preparation guide is available at the Department of Public Works.A copy of the SWPPP shall be <br /> maintained on the construction site and presented to any County, State or Federal employee on demand. <br /> The SWPPP onsite shall include all required records, updates,test results and inspections. The post <br /> construction chapter of the SWPPP must identify expected pollutants and how they will be prevented <br /> from entering the storm system. The chapter shall also contain a maintenance plan, a spill plan, and a <br /> training plan for all employees on proper use,handling and disposal of potential pollutants. The <br /> example plans are available in the CASQA handbooks. <br /> c. Owner shall be responsible for providing the County with an annual report of operation and maintenance <br /> of any system. The property owner shall also be responsible for the payment to the County of an annual <br /> system inspection fee. <br /> d. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement will be <br /> required for the owner/operator of stormwater controls prior to the final acceptance. <br /> e. Standard Best Management Practices, for the type of development proposed,shall be incorporated <br /> into the site design. <br /> Informational Notes: <br /> (i.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building Division of the <br /> Community Development Department prior to issuance of the building permit. Contact the Solid Waste <br /> Division(468-3066)for information. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito &Vector Control District(209- <br /> 982-4675) and the California Health and Safety Code for the prevention of mosquitoes. Best Management <br /> Practices (BMP)guidelines for stormwater devices, ponds and wetlands are available. <br /> AC:BD <br /> X ICOMMENTMA(Site Approval)IYR 20151PA-1500168 Truck Parking Tracy BlvdIPA-1500168.doc <br />