Laserfiche WebLink
1 THOMAS R. FLINN P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR r "SGA. STOCKTON,CALIFORNIA 95201-3018 <br /> (209)468-3000 FAX(209)468-2999 <br /> 4Fona www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> MANUEL SOLORIO WOrinng for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE RECEIVED <br /> BUSINESS ADMINISTRATOR <br /> November 8, 2004 NOV 8 2004 <br /> Communk Development Dept. <br /> MEMORANDUM <br /> TO: Chandler Martin,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Kathy Allen <br /> FROM: Michael R. Callahan, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-04403 A SITE APPROVAL APPLICATION FOR A BOUTIQUE WINERY IN AN <br /> EXISTING 1,245 SQUARE FOOT STRUCTURE. THE WINERY WILL BE ACCESSED FROM <br /> WEST TURNER ROAD BY A 1,400 FOOT LONG ACCESS ROAD, LOCATED ON AN <br /> ACCESS ROAD OFF OF WEST TURNER ROAD, THAT BEGINS 1,300 FEET EAST OF <br /> DAVIS ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: James Peterson <br /> ADDRESS: 1075 W. Turner Road APN: 015-050-15 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> RECOMMENDATIONS: <br /> 1. The approach at Turner Road shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is$185.21 per 1,000 gross square foot of <br /> building designated as Manufacturing in the Lodi area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />