Laserfiche WebLink
Y <br /> Quanerly Monitoring Reyort-First Quarter of2009 Page 6 <br /> TURNER ROAD VINTNERS April 30, 2009 <br /> WKA No. 5279.03 <br /> 6.0 SUMMARY <br /> Quarterly groundwater monitoring of the process wastewater treatment well network was <br /> �- conducted on February 4, 2009 at the Turner Road Vintners' facility. The DTW and <br /> groundwater elevation at the time of monitoring ranged between 13.71 and 24.53 feet blue and <br /> —0.31 to +3.05 feet msl, respectively. The direction of groundwater flow on the date of <br /> monitoring was southeasterly at a calculated hydraulic gradient of 0.0007 feet per feet. <br /> Groundwater elevation has been trending downward since July 2006. The overall change in <br /> groundwater elevation since January 2007 is approximately 4 feet. <br /> First-quarter groundwater analytical results for wells MWl through MW5 were generally <br /> consistent with the existing body of data. Results of water samples from monitoring wells MW4 <br /> and MW5 continue to show elevated values of TDS and specific conductivity, as compared to <br /> monitoring wells MWl, MW2, and MW3. <br />