Laserfiche WebLink
-3- <br /> f. The applicant shall file a Notice of Intent with the State Water Resources Control Board (SWRCB) <br /> to state the intent to comply with the State General Permit for Storm Water Discharges <br /> Associated With Construction Activity. The Waste Discharge Identification Number issued by <br /> SWRCB shall be submitted to Public Works for the file. <br /> g. The applicant shall submit a Storm Water Pollution Prevention Plan (SWPPP) to Public Works for <br /> review. A SWPPP preparation guide is available from Public Works. A copy of the SWPPP shall <br /> be maintained on the construction site and presented to any County, State, or Federal employee <br /> on demand. The SWPPP on the site shall include all required records, updates, test results, and <br /> inspections. <br /> NOTE: This property is subject to the requirements of the San Joaquin County Mosquito and Vector <br /> Control District (209-982-4675) and the California Health and Safety Code for the prevention of <br /> mosquitoes. Best Management Practices guidelines for storm water devices, ponds, and wetlands <br /> are available. <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Staff Contact: Michael Escotto, 209-468-3443) <br /> a. Prior to issuance of building permits, an application shall be submitted to Environmental Health to <br /> amend the existing permit to operate the water system and to address any new water distribution <br /> lines and additional water demands to serve the new buildings. Contact Adrienne Ellsaesser, Lead <br /> Senior Registered Environmental Health Specialist, at(209)468-0343 for assistance. <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff Contact: Laurel Boyd, 209-235-0600) <br /> a. This project is not subject to participate at this time in the San Joaquin County Multi-Species Habitat <br /> Conservation and Open Space Plan (SJMSCP) due to structure and ground disturbance already <br /> existing. Any future structures that require ground disturbance on this or subsequent divided <br /> parcels will be subject to participate in the SJMSCP and should be resubmitted to this agency. <br />