My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005713
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
3685
>
2600 - Land Use Program
>
PA-0200631
>
SU0005713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:43 AM
Creation date
9/9/2019 10:50:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005713
PE
2611
FACILITY_NAME
PA-0200631
STREET_NUMBER
3685
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
FRENCH CAMP
APN
17520002 & 03
ENTERED_DATE
10/19/2005 12:00:00 AM
SITE_LOCATION
3685 S TURNPIKE RD
RECEIVED_DATE
12/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\APPL.PDF \MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\CDD OK.PDF \MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\EH COND.PDF \MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k. Street lighting shall be provided for the subdivision, the frontage of Turnpike Road, and at the <br /> intersection of Turnpike Road and Clayton Avenue. The property shall transfer to a zone within the <br /> Southwest Stockton Street Lighting District prior to approval of the Parcel Map to provide for the <br /> operation, maintenance, and improvement of street lighting facilities. A new assessment for the zone <br /> shall be approved by the property owners prior to approval of the Parcel Map. The assessment for <br /> the new zone shall be based on the cost for maintenance, operation, system improvements, and any <br /> replacement program of facilities within the Stockton Street Lighting District. The applicant shall pay <br /> for the cost to process the transfer and assessment for the new zone. In addition, the applicant shall <br /> pay for the maintenance and operation of the system from the time the facilities are accepted by the <br /> District until the transferred area is placed on the assessment role of the District. (Development Title <br /> Section 9-1150.11) <br /> I. A County Service Area shall be created prior to approval of the Final Map to provide for the <br /> operation, maintenance, and improvement of storm drainage and street lighting facilities. A new <br /> assessment for the zone shall be approved by the property owners prior to approval of the Final <br /> Map. The assessment for the new zone shall be based on the cost for maintenance, operation, <br /> system improvements, and any replacement program of facilities within the CSA. The applicant shall <br /> pay for the cost to process the transfer and assessment for the new zone (Proposition 218). In <br /> addition, the applicant shall pay for the maintenance and operation of the system from the time the <br /> facilities are accepted by the District until the transferred area is placed on the assessment role of the <br /> District. (Development Title Section 9-1100.5) <br /> m. This subdivision is approved for recording as a single unit. Phasing is not approved. (Development <br /> Title Section 9-1100.3) <br /> n. A Preliminary Soils Report is required in accordance with the County standards for the purpose of <br /> determining the R-Value for the design of the roads. (Development Title Section 9-910.2) <br /> o. All utilities shall be underground except power transmission facilities of 35 KV or greater. Public <br /> utility easements shall be provided along the road frontage of the subdivision and as required by the <br /> public utility companies. (Development Title Section 9-1155.2) <br /> p. A grading plan shall be submitted and.approved prior to approval of the Final Map. The grading plan <br /> shall contain the information listed in the UBC, Appendix, Chapter 33, Section 3309, with complete <br /> drainage details and elevations of adjacent parcels. Retaining wall details shall be submitted where <br /> applicable. Grading in excess of 5,000 cubic yards shall comply with Sections 3309.3 and 3309.4 for <br /> "Engineered Grading Requirements." Grading that disturbs more than five acres will require a <br /> National Pollutant Discharge Elimination System permit. <br /> q. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements are accepted by the County until the lots are placed on the County tax rolls, or up to <br /> an 18-month period, as the case may be. (Subdivision Map Act Section 66493) <br /> r. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control Devices and <br /> San Joaquin County standards and shall be shown on the improvement plans. (Development Title <br /> Section 9-1150.2) <br /> s. An Offer of Dedication of ground water rights is required. <br /> t. All new structures shall be elevated to one foot above the 100-year flood elevation of 12 feet NGVD. <br /> In addition, all new structures shall be set back 25 feet from French Camp Slough. <br /> u. The lots adjacent to Turnpike Road shall have driveways designed to restrict backing onto Turnpike <br /> Road. <br /> Conditions of Approval -4- PA-02-631 <br />
The URL can be used to link to this page
Your browser does not support the video tag.