Laserfiche WebLink
TABLE OF CONTENTS <br /> FFLINTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> II. SOIL SUITABILITY STUDY FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> A. SUBJECT PROPERTY AND SURROUNDING STUDY AREA INFORMATION . 2 <br /> B. SOIL PHYSICAL CHARACTERISTICS AND ANALYTICAL TEST RESULTS ... 2 <br /> C. PERCOLATION TEST RESULTS ... . .. ... .. . .. .. .. ... .. .. .. .. ... .. .. ... ... 3 <br /> D. GROUNDWATER INFORMATION . .. ... . .. .. ... .. .. ....... .. .. .. . .. ..... . 4 <br /> CALCULATION OF ALKALINITY REQUIREMENT FOR NITRIFICATION <br /> E. SURFACE WATER INFORMATION .. ... ..... ..... .. .. .. ... .. .. .. .. ... ... . 5 <br /> CLIMATIC DATA: RAINFALL VERSUS EVAPOTRANSPIRATION <br /> III. NITRATE LOADING STUDY FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> A. WASTEWATER FLOW VOLUME PROJECTIONS AND CHARACTERISTICS .. 6 <br /> B. CALCULATED NITRATE-NITROGEN LOADING .. .. .. .. .. .. . .. .. . .. .. ... .. 7 <br /> IV. WASTEWATER DISPOSAL SYSTEM OPERATIONAL PARAMETERS . . . . . . . . 9 <br /> V. CONCLUSIONS AND RECOMMENDATIONS . ... . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> VI. LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II <br /> VII. REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> VIII. APPENDICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> APPENDIX A: USE PERMIT,SITE PLAN AND S.C.J.PARCEL VIEWER MAPS(SSS§ 1.3, 1.4) <br /> APPENDIX B: SOIL PROFILE CHEMICAL ANALYSES OF PRIMARY DISPOSAL AREA <br /> APPENDIX C: PERCOLATION TEST LOCATION RESULTS WITH LOG OF BORING <br /> APPENDIX D: CHAIN OF CUSTODY FORM(SS 4.6) <br /> Chesney Consuftg <br />