Laserfiche WebLink
Steph9nie Stowers -2- <br /> Community Development Department <br /> PA-14b0011 (SA) <br /> 2. Prior to issuance of the occupancy permit,the driveway approach onto State Route 99 E.Frontage Road shall <br /> be improved in accordance with the requirements of San Joaquin County Improvement Standards Drawing <br /> No.R-17. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 4. The Regional Transportation Impact Fee shall be required for this application. The fee is due and payable at <br /> the time of building permit application.The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Applicant shall file all Permit Registration Documents(PRDs)with the State Water Resources Control Board <br /> (SWRCB)to state the intent to comply with the State"General Permit for Storm Water Discharges Associated <br /> with Construction Activity". The Waste Discharge Identification Number(WDID)issued by SWRCB, shall be <br /> submitted to Public Works for file. <br /> Informational Notes: <br /> (i.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building Division of the <br /> Community Development Department prior to issuance of the building permit. Contact the Solid Waste <br /> Division (46873066)for information. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito& Vector Control District(209- <br /> 982-4675) and the California Health and Safety Code for the prevention of mosquitoes.Best Management <br /> Practices(BMP) guidelines for.stormwater devices,ponds and wetlands are available. <br /> (iii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. <br /> As an example,these requirements may include raising the finish floor elevation one foot above the expected <br /> flood level and/or using flood resistant materials. <br /> AC:$Q <br /> F.IC9WEM7M1YR20141PA-1400011(Solm Power Facility-Verigin Rd.)IPA-1400011:dm <br />