Laserfiche WebLink
r <br /> AGENCY NAME: Musco Family Olive Company -18- <br /> SITE NAME: Wastewater Treatment and Land Disposal Facility <br /> INSPECTOR: Hossein Aghazeynali <br /> Erosion <br /> as <br /> - � channel <br /> i• 1 <br /> 05 £tel <br /> _L• �,,,�,�y `tip I�.. �., �. <br /> Photo 60. 55 East Field sump Photo 63. Detail of 55 East Field sump <br /> showing erosion channel to drainage <br /> created by wastewater/storm water <br /> � <br /> Drainage <br /> :. flow path <br /> Erosion <br /> 'F r A - channel <br /> . 3 � '. ,,gyp,-�-••�.7�T.:~ .. � J: <br /> y <br /> Photo 61. Detail of 55 East Field sump Photo 64. Erosion channel from sump <br /> to drainage <br /> ` Spill <br /> x-1177 <br /> r ... <br /> e <br /> R—i <br /> 3 <br /> r <br /> f.V 'Qy i 7 i <br /> u?£�=�x <br /> Photo 62. <br /> Detail of 55 East Field sump g <br /> Photo 65_ Standing wastewater and storm <br /> showing spill path (continues to drainage) water in eucalyptus grove north of 55 East <br /> Field <br /> PICTURES TAKEN BY: Todd Del Frate, Engineering Geologist, and Hossein Aghazeynali, WRC Engineer <br /> PICTURE DATE: 23 March 2006 <br /> TIME: 10:00 A.M.-4:30 P.M. <br />