My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005250
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2600 - Land Use Program
>
PA-0500462
>
SU0005250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:34 AM
Creation date
9/9/2019 10:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005250
PE
2631
FACILITY_NAME
PA-0500462
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911031& 32
ENTERED_DATE
7/26/2005 12:00:00 AM
SITE_LOCATION
17950 W VIA NICOLO RD
RECEIVED_DATE
7/25/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\APPL.PDF \MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\CDD OK.PDF \MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\EH COND.PDF \MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENCY NAME: Musco Family Olive Company <br /> SITE NAME: Wastewater Treatment and Land Disposal Facility <br /> INSPECTOR: Hossein Aghazeynali <br /> Evaporation South Field <br /> Drainage <br /> flow path <br /> Photo 1. Evaporation South Field from Photo 4. Dark-colored sediment discharge <br /> I-580 in drainage near first culvert under 1-580 <br /> E Drainage reach cleared of vegetation <br /> - <br /> f <br /> E <br /> E <br /> Drainage flow path to culvert <br /> Photo 2. Drainage near Evaporation South Photo 5. Inlet to first culvert under 1-580 <br /> Field that flows under 1-580 <br /> IE 1 <br /> f <br /> Photo 3. Drainage near Evaporation South Photo 6. Surface water channel over <br /> Field — note no wastewater pipelines Aqueduct downstream of first culvert under <br /> 1-580 <br /> E <br /> PHOTOGRAPHS BY: Hossein Aghazeynali, WRC Engineer <br /> PHOTOGRAPH DATE: 18 May 2006 TIME: 10:00 A.M.-4:30 P.M. <br /> E <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.