My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005250
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2600 - Land Use Program
>
PA-0500462
>
SU0005250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:34 AM
Creation date
9/9/2019 10:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005250
PE
2631
FACILITY_NAME
PA-0500462
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911031& 32
ENTERED_DATE
7/26/2005 12:00:00 AM
SITE_LOCATION
17950 W VIA NICOLO RD
RECEIVED_DATE
7/25/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\APPL.PDF \MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\CDD OK.PDF \MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\EH COND.PDF \MIGRATIONS\V\VIA NICOLO\17950\PA-0500462\SU0005250\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} hn KLEIN FELDER <br />�h <br /> 1 INTRODUCTION <br /> Musco Olive Products, Inc. has a year-round olive processing and packaging facility on <br /> approximately 320 acres of land at 17950 Via Nicolo in Tracy, California (Plate 1). Process <br /> water from the production of olives generates approximately 400,000 to 500,000 gallons per day <br /> (gpd) of wastewater. Depending on the level of salinity of the wastewater, the facility currently <br /> applies the wastewater onto crop/grazing fields, approximately 200-acres (Plate 2), or stores the <br /> wastewater in an existing one million-gallon pond. An 84-million gallon storage pond is under <br /> construction in the southwest portion of the facility. <br /> This workplan was prepared to address the requirements of Waste Discharge Requirements <br /> (WDR) Order No. R5-2002-0148 dated September 13, 2002. The RWQCB requested the <br /> submittal of a "Groundwater Monitoring Well and Lysimeter ..Installation Workplan". The <br /> proposed monitoring well locations mi this workplan are intended to evaluate first encountered <br /> groundwater conditions both upgradient and downgradient of the 84 million gallon storage pond. <br /> This workplan is subject to the limitations presented in Section 5.2. Any other party (other than <br /> Musco Family Olive Company or regulatory agencies having enforcement'jurisdiction for the <br /> site) who would like to use this document shall notify Kleinfelder, Inc. of such intended use by <br /> t executing the"Application for Authorization to Use" contained in Appendix D. <br /> I . <br /> I� <br /> 4 <br /> 13498.WP215T02R534 Page 1 of 13 <br /> Copyright 2002,Kleinfelder,Inc. September 26,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.