Laserfiche WebLink
I <br /> � I <br /> Ben Hall -7- 22 November 2006 <br /> Musco Family Olive Company <br /> Discharge to LTUs Date H Discharge to LTUs <br /> Date pH millions of gallons) p millions of gallons <br /> 1-Au -2006 8.86 1.622416 13-Aug-2006 9.61 2.235066 <br /> 5-Aug-2006 8.84 1.356837 18-Aug-2006 8.67 1.358656 <br /> 7-Au -2006 8.69 1.545162 21.-Aug-2006 8.60 1.661688 <br /> 9-Aug-2006 8.51 2.406292 25-Au -2006 8.52 2106707 <br /> 10-Au -2006 9.43 2.212156 28-Aug-2006 8.57 1.886018 <br /> 12. WDRs Order No. R5-2002-0148 includes Land Application Area Specification D.7, which <br /> requires that "f irrigation with process wastewater shall not be performed within 24 hours <br /> of a forecasted storm; during a precipitation event, 24 hours after a precipitation event, or <br /> when the ground is saturated." This requirement was violated on thirteen occasions <br /> I Auring.the-period-reviewed;-as.shown,:in.the following table:,,� ;_, <br /> Irrigation Irrigation <br /> Precip. Precip- Precip; Precip. <br /> Date Duration Date Hours Duration <br /> (in) Hours (hours) (in) (hours) <br /> 3-Apr-2005 0.14 1900-2300 0.5 30-Mar-2006 0.01 0100-1500 1.25 <br /> 4-Apr-2005 0.00 -- 0.5 31-Mar-2006 0.07 1500-1900 0.5 <br /> 8-A r-2005 0.12 0900-1100 0.5 7-Apr-2006 0.07 1600 0.5 <br /> 27-Apr-2005 0.08 1300-2000 1.0 21-Apr-2006 0.07 1500 1.0 <br /> 4-May-2005 0.16 2000-2400 1.0 19-May-2006 0.01 -- 2.0 <br /> 17-Feb-2006 0.11 1500-1700 1.5 21=Ma -2006 0.28 -- 1-0 <br /> 27-Mar-2006 0.27 1600-1800 0.5 <br /> 13. As reported.in the June and July 2006 DSMRs, failure of the. power supply to the <br /> continuous data logger resulted in the loss of metered million-gallon pond electrical <br /> conductivity and pH data. Failure to continuously monitor for these parameters is a <br /> violation of the Industrial Wastewater Monitoring section of Monitoring and Reporting <br /> Program (MRP) No. R5-2002-0148. <br /> 14. MRP No. R5-2002-0148 requires weekly monitoring of BODS, nitrates as nitrogen, total <br /> Kjeldahl nitrogen, fixed dissolved solids, total dissolved solids,.sodium, and chloride4on-a <br /> weekly basis from the million-gallon pond. No results were reported for the million-gallon <br /> pond for these constituents for week ending 3 December 2005. Failure to monitor at the <br /> required frequency is a violation of MRP No. R5-2002-0148. <br /> 15. MRP No. R5-2002-0148 requires daily monitoring of freeboard, dissolved oxygen, <br /> dissolved sulfide, and pH for the million-gallon and 84-million gallon ponds. Results for <br /> these,parameters in the million-gallon pond were not reported for 9, 16, 22, 23, 29, and <br /> 30 July 2006 and 12, 13, 19', and 20 August 2006, out of 608 required monitoring days.. <br /> Results for these parameters in the 84-million gallon pond were not reported for 9, 22, 23, <br /> 29, and 30 July 2006, and 12 and 20 August 2006, out of 608 required monitoring days. <br /> i In addition, dissolved sulfide was not reported,for the 84-million gallon pond for 1 through <br /> 8, 10 through 13, 15 through 19, and 21 through 30 June 2006. Failure to monitor at the <br /> jrequired frequency is a violation of MRP No. R5=2002-0148. <br />