Laserfiche WebLink
AgUfry <br /> O. y.c G <br /> THOMAS R. FLINN $ P.d.BOX 7810—1810 E.NAZELTON AVENUE <br /> DIRECTOR �. STOCKTON,CALIFORNIA 95201-3018 <br /> r- (209)468-3000 FAX(209)-468-2999 <br /> oRµ ww :co.san-joaquin.ca.us 7 <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> MANUEL'SOLORIO Y®ZJ <br /> DEPUTY DIRECTOR <br /> p "h <br /> STEVEN WINKLER, <br /> ' REPUTY DIREGTOR <br /> BENTON ANGOVE <br /> 'BUSINESSADMINFSTRATORM . <br /> A '0 200 ` <br /> March 2, 2006 .Communis Development.Dept. <br /> MEMORANDUM <br /> TO: Chandler Martin,Deputy Director <br /> Community Development Department <br /> CONTACT-PERSON. Kevin S anson a <br /> FROM: Dean Gilman,Engineer.N <br /> Public Services Division <br /> SUBJECT: PA-05-17 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE A 14,213 SQUARE <br /> FOOT LOT INTO TWO PARCELS. PARCEL ONE AND TWO TO CONTAIN 7,110 <br /> SQUARE FEET EACH,LOCATED ON THE WEST SIDE OF WAGNER ROAD, . ,. <br /> APPROXIMATELY 75 FEET SOUTH OF HORNER ROAD. <br /> (SUPERVISORIAL DISTRICT 2) <br /> PROPERTY OWNER: John and Zita Colombini, TR APPLICANT: Dillon and Murphy' <br /> ADDRESS: 715 Wagner Road APN: 159-070-16 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Wagner Road has an existing right-of-way width of 50 feet and a planned right-of-way width of the same} <br /> Dawes Road has an existing right-of-way width of 50 feet and a planned right-of-way width of the same. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> I. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) i <br /> 3. The project shall be served by a public sewer collection system constructed in conformance with the <br /> requirements of the San Joaquin County Public Health Services Environmental Services Division and the <br /> Department of Public Works. (Development Title Section 9-1105..2) <br />