Laserfiche WebLink
COMMENTS. ONDEVELOPMENTS <br /> SA- <br /> '94-22 <br /> 3 . The owner shall execute an Irrevocable Offer and Agrement tolt�­ �1- <br /> Dedicate right-of-way that conforms to minimum San Joaquin <br /> County Standards for horizontal curves along Walnut Grove <br /> Road. A $225. 00 fee currently is required for processing per, , <br /> Development- Title Table 9-240. 2 in addition to a copy Wf` the" <br /> GrantDian recording6d�e, fee and a legal description of the <br /> pai7ce 1 to <br /> offered for dedication, <br /> 4. The frontage...,-improvements for Walnut Grove Road shall be <br /> constructed in con f ormancita?with" e '9ta' n- dards*'k or'on' e-'h' a 1 f of <br /> an 84-f oot;.right-of.-way Rural'•Arter' ia-l'Roa' d.'-'-' The,'co-Hstrii6tion <br /> of the frontage improvements; will =b-e,def eri&I-, u <br /> upon' ex�_- tion� , <br /> by the owneir "of a Deferred Frontageland Roadway Improvement <br /> Agreement or a' SC*cure' d': - Def e'rred` Frontage nand Roadway <br /> Improvement Agreement with a deposit- �equivzil`e nt `' -t'o ""their <br /> estimated construction costs prior to approval of Improvement <br /> Plan. A $260.00-,fee- curr'ently;-isxrequiredZ <br /> --fo'r"--processing per <br /> Devel4ment. Title-Table 9-240.*2 in addition to"a copy 'o.f. the <br /> Grant-.Deed, -.recording,fee, leqa" l aescriptionls­- of'property and <br /> an estimate. The estimate and legal descri'ptibAsi-I "shall be <br /> piepared by a Registered Civil Engineer with a typical section <br /> drawing on 4,a- form:°`to "b-e supplied ' by the­Pu'bfi6- Works <br /> Department and submitted to the Public Works Department for, .._' <br /> approval. As an option the Department of Public Works" "Will <br /> prepare the drawing with estimate for a fee of $115. 00. <br /> (Development-,Title :Section '9-1100 3) - <br /> I "V tv �:J <br /> 5. The, Traffic , Impact,mitigation .Fe6-�wi-11`-, be''r- eiqu-i <br /> red 'for .th.i <br /> development.,:4 'The' .feeAs1:due-afid payable. pri6rI-to approval of - A,7 <br /> -1 <br /> the- improvement,plant.,v The- fee.,"currently"-'i"S-'$631:--Oo per'!I-, 000 <br /> gross square foot of, bui'ldiiig' -as7:'manUfactiiiiii4,.'Or, $164 .,07 per.1 <br /> daily,.:trip7end generated -in' the,Thornt6n' --area--* '-Th�d 'fee �shah. <br /> 9 <br /> be.-:.automatically- adjusted !�July 11 =of- *each l'y;ear'l=by"- 'th- <br /> " <br /> Engineering ; Construction . Cost Inde2 -as',', p' uiblisfi6d­ jby the <br /> Engineering!-.News ,Record.**, -Credit , will be'`• given for ther: <br /> exist ing�building orlpresent'us6.- <br /> (Resolution R-90-304 , R-91-1025., R-93-167, R-94-174) <br /> v <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> -13 1 <br /> -I t <br /> 2 <br />