<br /> Regulation VIII Fugitive Dust/PM1, Synapsis
<br /> Rule 8010 Admtn�stratwe Requirements
<br /> Section Applicability Req uirements/lmplern entatiorn a
<br /> i
<br /> 2.0 Applicability: This regulation applies to specified outdoor man=made sources of fugitive dust for the purpose of attaining
<br /> health-based standards for fine particulate matter (PM,,). Effective Date of Regulation Vill Rules: December 10, 1993.
<br /> {For the purpose of this regulation visible dust emissions is'defined as: visi-le dust of such opacity as to obscure an
<br /> observer's view to a degree equal to or greater than an opacity of 40% (40%), fora period or periods aggregating more i
<br /> than three minutes in any one hour, except as set fourth in Rule 8030, 5.1.)
<br /> 4.0 Exemptions: (All Regulation Vlll Rules)Actions required by law to protect the environment; current District permitted activ-
<br /> ities with PM,,control measures greater than or equal to this regulation; public health & safety emergency operations J
<br /> lasting less than 30 days; vegetative reduction required by.a Federal, State or local agency for fire prevention; and
<br /> activities conducted above the elevation of 3000 feet, or,during freezing conditions.
<br /> . 5.1 Chemical Stabilizing Agents. Must meet ARB/EPA acceptability and airlwater quality standards.
<br /> 5.4 Dust Palliative and Asphalt Paving. Shall comply with other applicable District Rules (i.e. Rule 4641)
<br /> Remalittort. XGYa#Eon, ExtractEon :;k:,::-<: r
<br /> 2.0 Applicability:Any construction, demolition, excavation, extraction, water mining related disturbances of soil,and the initial
<br /> construction of landfillsprior to commencement of landfill operations.
<br /> 4.0 Exemptions: Land preparation for agriculture; activities approved prior to the effective date of this Rule; blasting activities;
<br /> maintenance or remodeling activities of less than 10,000 square feet or 50% of building area; renovation of ground
<br /> water recharge basins; and solar drying &harvesting of sedimentary calcium carbonate precipitates. Compliance with
<br /> Section 5.1 of this rule is not required where soil moisture or natural crusting is sufficient to limit visible dust emissions.
<br /> 5.1 All disturbed areas of a construction site, including Effective.stabilization of visible dust emissions(40%)utilizing water,
<br /> storage piles, not used for seven or more days. chemical stabilizer/suppressant, or vegetative ground cover.
<br /> 5.2 On-site unpaved roads and off-site unpaved access Effective stabilization of visible dust emissions(40%)utilizing water,
<br /> roads. or a chemical stabilizer/suppressant.
<br /> 5.3. Land clearing, grubbing, scraping, excavation, land Effective,control of fugitive dust emissions utilizing the application
<br /> leveling, grading, cut&fill and demolition activities. of water; or by presoaking.
<br /> Operation of wrecking balls or wrecking equipment. All exterior surfaces of a building up to six stories in height shall be
<br /> wetted during demolition.
<br /> 5.4 Public paved roads, shoulders and access ways Limit or,, promptly remove any accumulation of mud or dirt.
<br /> adjacent to the site. Recommended use of paved aprons, gravel strips or wheel washers.
<br /> The use l'of blower devices for the removal of accumulations is
<br /> prohibited. The use of dry rotary brushes is prohibited, except
<br /> where preceded or accompanied by wetting to limit dust emissions.
<br />,3uTe�803f Stacager fantfilr�g n. roc spo t of Bulk MateriaJ- x f*
<br /> ...........
<br /> 2.0 Applicability: Outdoor handling/storage of bulk material emitting visible dust. Additional requirements may apply if com-
<br /> pliance with this Rule requires installation/modification of equipment under existing District permit.
<br /> 4.0 Exemptions: Conditions where moisture content of the material is sufficient to limit visible dust emissions; agricultural
<br /> harvesting, open air drying, handling or storage of baled, cubed, pelletized,long-stemmed or pre-cleaned material;timber
<br /> harvesting; dust.free materials; materials less than 250 cutiic yards; and materials subject to damage by wetting.
<br /> 5.1 Transport of bulk materials in an outside area fora Chute/conveyer must be fully enclosed, or spray equipment wets
<br /> distance of twelve feet or,greater with the use of a 'materials to limit visible dust emissions (20% opacity) as defined in
<br /> chute or conveyor device. District Rule 4101-Visible Emissions, or materials conveyed are
<br /> washed, separated, or screened to remove PM,
<br /> 5.2 Materials transported by vehicle, except on site. Requirements of Rule 8020, 5.4 apply. Wet material to limit visible
<br /> dust emissions (40%), or provide at least six inches of freeboard
<br /> space from the top of the transport container, or cover the container.
<br /> 5.3 Outdoor storage of materials greater than 250 cubic Effective stabilization of visible dust emissions(40%)utilizing water,
<br /> yards. or a chemical stabilizer/suppressant within seven days after the I
<br /> addition or removal of materials_