Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-96-12 (REVISION) <br /> 3. 9edieafiett to resttit in �1 25 foat wide fight of-way f-rarn the eenterline of Sunset Avenue te the <br /> (gftipe) at the interseetion of Wft+erldo Road- The owner shall execute an Irrevocable Offer and <br /> Asreement to Dedicate Road to result in a twenty-five (25) foot wide right-of-way_from the <br /> centerline of Sunset Avenue to the property line across_the parcel's frontage plus a 20'x20' <br /> corner cut-off sni e at the intersection of Waterloo Road_ A $225.00 fee currently is <br /> required for processing,per Development Title Table 9-240.2_in addition to a cop�: of the <br /> Grant Deed and a legal description of the parcel to be offered for dedication.) <br /> (Development Title Section 9-1150.5) <br /> 4. The frontage improvements for Sunset Avenue shall be constructed in conformance with the <br /> standards for one-half of a 50-foot right-of-way local residential street with vertical curbs and a <br /> handicap ramp at the corner of Waterloo Road. The construction of the frontage <br /> improvements will be deferred upon execution by the owner of a Deferred Frontage and <br /> Roadwav Improvement Agreement or a Secured Deferred Frontage and Roadway <br /> Improvement Agreement with a deposit equivalent to their estimated construction costs prior <br /> to approval of the Improvement Plan. A $260.00 fee currently is required for processing per <br /> Development Title Table 9-240.2 in addition to a copv of the Grant Deed and an estimate for <br /> the required frontage improvements. The estimate shall be prepared.by a Registered Civil <br /> Engineer with a typical section drawing on a form to be supplied_by the Department of. <br /> Public Works and submitted to the Department of Public Works for approval. As an option, <br /> the Department of Public Works will prepare the drawing and estimate for an additional fee of <br /> 115.00. <br /> (Development Title Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $1,039 per 1,000 gross <br /> square foot of building as Service Commercial in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) A credit may be allowed for the previous use if it <br /> can be verified that the site has been used since April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> 6. The City of Stockton shall verify that the sewer service has been paid for the proposed <br /> development. <br /> TMI:RH:ti <br /> PS-6D 1221 I <br /> E: Manuel Lopez, Deputy Director/Development <br />