Laserfiche WebLink
SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br />FILE NUMBER: PA - <br />RECLAMATION PLAN <br />CHECKLIST - CONTINUED <br />B. Reclamation Schedule: <br />[X] 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br />lands that will not be subject to further disturbance. <br />[X] 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br />each phase. <br />[X] 3. If reclamation will not be concurrent with mining, explain why. <br />C. Post Mining Topography: <br />[Xj 1. Provide a map of proposed post -reclamation topography; show drainage plan, benches, roads, plantings, and other <br />pertinent features of the reclamation. <br />[X] 2. Attach cross sections through slopes, cuts, and fills; show original ground, post -mining surface, underlying geologic <br />conditions, and reclaimed surface. <br />[X] 3. Describe how slopes will be stabilized to prevent failures/landslides, earth Flows, falling rock, and erosion. <br />[] 4. Specify slope design calculations including the factor of safety. <br />[ ] D. Impoundments: Describe how impoundments will be reclaimed (e.g., regraded, dewatered, capped, revegetated, <br />removed, etc.). <br />[X] E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be <br />controlled during excavation and after final reclamation (e.g., revegetation, rip rap, sedimentation basins, berms, ditches, <br />water bars, silt screens regrading, etc.). <br />[Xj F. Disposition of Old Eguipment: Discuss the disposition of equipment, buildings, structures, etc. <br />G. Revegetation: <br />[X] 1. Explain topsoil (or soil substitute) redistribution methods, including volumes of materials to be redistributed, <br />equipment and methods for transport, methods for preventing over compaction, and schedule for replacement. The <br />explanation may include: <br />[ j a. The average thickness of replaced topsoil on the mine site. <br />[ ] b. Tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support <br />plant growth. <br />[ ] c. Methods to be used to protect redistributed topsoil (or soil substitute) from wind and water erosion before and <br />after seeding and planting. <br />[ j 2. Explain the types and amounts of fertilizers, mulch, soil stabilizers, lime, or other materials that will be used in <br />revegetation and indicate when they will be applied. <br />[ ] 3. Provide a planting plan. The plan may include: <br />[ ] a. How the site will be prepared for planting (e.g., ripping, disking, and incorporation of soil additives). <br />[ ] b. A list of the species (include scientific names) to be planted. <br />[ ] c. The type of plant material to be used (e.g., seeds, cuttings, container, plugs). <br />F:\DEVSVC\Planning Application Fonns\ Page 11 of 15 <br />Agricultural Excavation.doc. (Revised 02-03-10) <br />