Laserfiche WebLink
APPLICATION - AGRICULTURAL EXCAVATION <br />SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br />FILE NUMBER: PA - <br />RECLAMATION PLAN <br />CHECKLIST - CONTINUED <br />D. Size: Provide the following information: <br />IN 1. Total acreage permitted or to be permitted. <br />[X] 2. Total acreage to be disturbed. <br />[X] 3. Total acreage to be reclaimed. <br />E. WaterReouirements: <br />[X] 1. Estimate of daily and annual water requirements. <br />[X] 2. Identify the sources and uses of water. <br />F. Contaminants: <br />[X] 1. Identify potential contaminants and describe how they will be controlled or disposed. <br />[ ] 2. Describe how imported wastes such as domestic garbage, chemicals, oil, or other materials will be disposed of. <br />G. Waste Water: Discuss: <br />[X] 1. How waste water will be contained or disposed of. <br />H. Ore Processing: <br />[X] 1. Describe the proposed method and equipment for processing ore (e.g., dry screening, flotation, leaching, etc.). <br />[X] 2. Estimate minimum and maximum capacity (input and output) of the mill/processing facility. <br />[X] 3. Provide the estimated fife of the processing operation (if different from mine life). <br />[ ] I. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of <br />the proposed operation. <br />III. DESCRIPTION OF PROPOSED RECLAMATION <br />A. Subsequent Use(s): <br />[X] 1. What is the proposed subsequent use for the reclaimed mined land (e.g., recreation, wildlife habitat, grazing, open <br />space, etc.)? <br />IN 2. Evidence that owner(s) of a possessory interest (including surface rights) have been notified of the proposed use or <br />potential uses after reclamation. <br />B. Reclamation Schedule: <br />[X] 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br />lands that will not be subject to further disturbance. <br />IN 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br />each phase. <br />IN 3. If reclamation will not be concurrent with mining, explain why. <br />IF1DEVSVMPlanning Application Forms\ Page 10 of 15 <br />Agricultural Excavation.doc. (Revised 02-03-10) <br />