My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012395
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13285
>
2600 - Land Use Program
>
PA-1800301
>
SU0012395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 3:13:46 PM
Creation date
9/9/2019 11:07:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012395
PE
2656
FACILITY_NAME
PA-1800301
STREET_NUMBER
13285
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
19104007
ENTERED_DATE
6/28/2019 12:00:00 AM
SITE_LOCATION
13285 S WILLOW GLEN RD
RECEIVED_DATE
4/13/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\W\WILLOW GLEN\13285\PA-1800301\SU0012395\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br />shall ba required where necessary for the control of erosion. An erosion and sediment control plan <br />approved by Development Services Division shall be part of the reclamation plan. (Development Title <br />Section 9-1410.3[m]) <br />g. HOURS OF OPERATION: Excavation operations shall not be carried on during the hours from 9:00 <br />p.m. through 5:00 a.m. (Development Title Section 9-1410.3[d]) <br />h. LIGHTING: Any night lighting established on the property shall be arranged and controlled so as not <br />to illuminate public rights-of-way or adjacent properties. (Development Title Section 9-1410.3[e]) <br />i. EMISSIONS: All emissions shall be subject to the rules and regulations of the San Joaquin Valley Air <br />Pollution Control District (Development Title Section 9-141 O -3[f]) <br />j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br />instructions from the Agricukural Commissioner of San Joaquin County. (Development Title Section <br />k. HEALTH CONSIDERATIONS: Excavations shall not cause health or sanitary hazards and shall not <br />create conditions which will cause the breading or increase of mosquito's, rodents, or other pests. <br />(Development Title Section 9-14t 0.3[i]) <br />I. COMMENCEMENT OF WORK: A written notification of work schedules shall be provided to the <br />County by the applicant prior to initiating. any grading or excavation. (Development Title Section 9- <br />1410.3[j]) <br />m. CERTIFICATION OF COMPLIANCE: At the completion of the grading of the project site, the applicant <br />shall have a registered civil engineer or licensed surveyor compare the excavation's final elevations <br />with the approved Improvement Plan. The engineer or surveyor shall submit a certified, written finding <br />to the Building Official which states and documents the compliance or noncompliance of the excavation <br />with the approved Improvement Plan. If the project conforms with the approved Improvement Plan, <br />the Review Authority shall accept the certif""kation and either notify the applicant that the stockpiled <br />material may be removed or release the required performance guarantee. (Development Title Section <br />n. ANNUAL INSPECTION REPORTS: Annual inspeMions of the excavation shall be conducted by the <br />County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br />may use professional services as provided for In Section 9-240.1 i. The consultant shall be selected <br />by San Joaquin County. Upon completion of [ha annual inspection, the person in charge of the mining <br />operation shall submit to the States Geologist and the County a report which shall contain all the <br />information as required by Section 2207 of the Public Resources Code. The cost of [he inspection <br />shall be paid by the operator. Additional inspections may be conducted, but the cost of additional <br />inspections shall be paid for by the operator only if non-compliance with the conditions of the <br />Agricultural Excavation Permit or the reclamation plan is found. (Development Title Section 9- <br />1410.3[0]) <br />o. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance with <br />conditions of approval, and compliance with County and state mining regulations, the applicant shall <br />provide pertormance guararrtees as a condition of the issuance of the Agricultural Excavation Permit. <br />Tha amount and form of the guarantee shell ba subject to annual review and approval by the County <br />and the state, antl the amount shall be adequate to ensure reclamation of disturbetl land and/or land <br />to be disturbed tluring a given phase. The annual review of the financial guarantee shall be <br />coordinated with the annual inspection antl approval of successive reclamation security so [hal the <br />guarantee includes the amount of tlisturbetl land plus [he amount of land estimated to be disturbed <br />during the nett 12 months, less the amount of lantl previously determinatl by Development Services <br />Division annual inspection to have bean reclaimed. The performance guarantee shall be in the form <br />PA -1800301 —Conditions of Approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.