My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007741
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WINDMILL COVE
>
7600
>
2600 - Land Use Program
>
PA-0900110
>
SU0007741
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:14 AM
Creation date
9/9/2019 11:07:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007741
PE
2630
FACILITY_NAME
PA-0900110
STREET_NUMBER
7600
STREET_NAME
WINDMILL COVE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
13122008
ENTERED_DATE
5/27/2009 12:00:00 AM
SITE_LOCATION
7600 WINDMILL COVE RD
RECEIVED_DATE
5/22/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\W\WINDMILL COVE\7600\PA-0900110\SU0007741\APPL.PDF \MIGRATIONS\W\WINDMILL COVE\7600\PA-0900110\SU0007741\CDD OK.PDF \MIGRATIONS\W\WINDMILL COVE\7600\PA-0900110\SU0007741\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> TERMS AND CONDITIONS <br /> IN SUBMITTING THIS PROJECT PROPOSAL, THE APPLICANT HEREBY ACCEPTS THE <br /> TERMS AND CONDITIONS SET FORTH AS FOLLOWS: <br /> A. No construction of additional slips or additional on-shore facilities is authorized by this grant. <br /> B. The marine pumpout/dump station shall be used for the collection of boat sewage only. No bilge <br /> or oily waste shall be collected in the marine pumpout/dump station. <br /> C. Sewage disposal agreements with local waste water treatment plants, local sanitary commissions, <br /> and/or public works departments if applicable, shall be submitted to the local Health Department <br /> prior to construction of the marine pumpout/dump station. <br /> D. Plans and specifications for the pumpout/dump facilities shall be submitted and approved by the <br /> local Health Department prior to construction of the marine sewage pumpout/dump station. <br /> E. Plans and specifications, including all contract documents and any subsequent changes, must be <br /> submitted to the Department of Boating and Waterways(Department) for review and approval in <br /> writing prior to construction start-up. <br /> F. The design of the project is the responsibility of the applicant. All necessary permits must be <br /> secured by said applicant, who is responsible for compliance with all permit requirements, state <br /> and local codes and the inspection of the project to insure compliance of materials, products, and <br /> workmanship with the approved plans and specifications. Periodic inspections and a final <br /> inspection shall be made by the Department to insure funds are properly spent. These <br /> inspections will not include design/engineering adequacy nor State and Local code compliance <br /> as these items are the responsibility of the installer. <br /> G. Any changes to the approved grant plans and specifications must be approved by the Department <br /> prior to construction to be eligible for reimbursement. <br /> H. The following documents must be supplied to the Department before a request for <br /> reimbursement can be processed: <br /> 1. An itemized statement of project costs listing the amount spent on each contractor or <br /> subcontractor. <br /> 2. One (1)copy of any permits required by applicable Federal, State and Local agencies. <br /> 3. Copies of all invoices and cancelled checks. <br /> I. The applicant will post two (2) signs: (1) a standardized logo Pumpout/Dump Station sign which <br /> 7/2006 (7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.