Laserfiche WebLink
( --of <br /> Raymond Hoo -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-033 (SA) <br /> 3. Dedication to result in a twenty-five(25)foot wide right-of-way from the centerline of Woodbridge Road <br /> to the property line shall be required across the frontage of APN 017-230-01. <br /> (Development Title Section 9-1150.5) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $193.16 per daily trip-end generated in the Lodi <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. The Regional Traffic Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> Note: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:ar <br /> PACOWAENTMM"20 A- 6 33,pd <br />