Laserfiche WebLink
'1 1 <br /> 1.� v <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: The Record <br /> Job Location: 350 E. Market Street Stockton California <br /> Client Name: The Record <br /> Project Number: 530 Date: February 24 2003 <br /> General Work Description: Advance one boring to approximately 25-30 feet bgs adjacent to <br /> former UST to investigate VOCs in soil <br /> SSP Prepared by: John Lane <br /> On-site Safety Officer: Sean Garvey <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. General safe work practices are <br /> identified in the Ground Zero Analysis, Inc. (GZA) Injury and Illness Prevention Manual and <br /> apply to all GZA work sites. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GZA at the job site. All personnel working for GZA at the job site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area. Field personnel may deviate <br /> from the safety provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements. GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. If <br /> changes in site or working conditions require changes in safety procedures, appropriate <br /> amendments to this SSP will be provided by the GZ4 project manager or supervisor, with the <br /> written approval of a GZA branch safety officer or the GZA Health and Safety Director. <br /> PAGE 2 <br />