Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> Site previously operated a 10,000-gallon UST to dispense unleaded gasoline Soil sample beneath <br /> south end of former UST contained low levels of xylenes MTBE, and TBA Potential chemical <br /> hazards are VOCs. <br /> Physical hazards include noise and physical proximity to drilling equipment A slight fire and <br /> explosion hazard exists due to presence of gasoline constituents <br /> © Underground/Overhead Utilities (show location of utilities on site map) <br /> ✓ How were underground utilities identified? Underground Service Alert will be called at <br /> least 48 hours prior to arriving on site. <br /> EXPOSURE MONITORING <br /> Soil cuttings and breathing zone should be monitored for volatile organics using a photo ionization <br /> detector (PID) at frequent intervals. Intervals and readings should be recorded in field notes. All <br /> sampling instruments will be calibrated per the manufacturer instructions on a daily basis. <br /> PAGE 3 <br />