My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BELLA LAGO
>
1699
>
2900 - Site Mitigation Program
>
PR0523856
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 3:16:55 PM
Creation date
9/16/2019 3:06:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0523856
PE
2965
FACILITY_ID
FA0016065
FACILITY_NAME
OAKWOOD SHORES
STREET_NUMBER
1699
STREET_NAME
BELLA LAGO
STREET_TYPE
WAY
City
MANTECA
Zip
95337
APN
24152013
CURRENT_STATUS
01
SITE_LOCATION
1699 BELLA LAGO WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KL E/NFEZ DER <br /> Bright People.Right 5n1urion <br /> LIMITATIONS <br /> Kleinfelder prepared this proposal in accordance with generally accepted standards of <br /> care which exist in San Joaquin County, California, at this time. It should be recognized <br /> that definition and evaluation of geologic and environmental conditions are a difficult <br /> and inexact science. Judgments leading to conclusions and recommendations are <br /> generally made with incomplete knowledge of the subsurface conditions present. More <br /> extensive studies, including subsurface investigations, may be performed to reduce <br /> uncertainties. If the client wishes to reduce the uncertainties beyond the level <br /> associated with this proposal Kleinfelder can be notified for additional consultation. No <br /> warranty, expressed or implied, is made. <br /> Kleinfelder offers various levels of investigative and engineering services to suit the <br /> varying needs of different clients. Although risk can never be eliminated, more-detailed <br /> and extensive investigations yield more information, which may help understand and <br /> manage the level of risk. Since detailed investigation and analysis involves greater <br /> expense, our clients participate in determining levels of service which provide adequate <br /> information for their purposes at acceptable levels of risk. Acceptance of this work plan <br /> will indicate that Oakwood Lake Water District has reviewed the scope of work and <br /> determined that it does not need or want a greater level of service than will be provided. <br /> Any exceptions should be noted and may result in higher fees. <br /> During the course of field activities performed by others, hazardous materials may be <br /> discovered. Unless caused by the negligence or willful misconduct, Kleinfelder will <br /> assume no responsibility or liability whatsoever for any claim, loss of property value, <br /> damage, or injury that results from pre-existing hazardous materials being encountered <br /> or present on the project site, or from the discovery of such hazardous materials. <br /> Nothing contained in this work plan should be construed or interpreted as requiring <br /> Kleinfelder to assume the status of an owner, operator, generator, or person who <br /> arranges for disposal, transport, storage or treatment of hazardous materials within the <br /> meaning of any governmental statute, regulation or order. <br /> Kleinfelder will perform its services in a manner consistent with the standards of care <br /> and skill ordinarily exercised by members of the profession practicing under similar <br /> conditions in the geographic vicinity and at the time the services will be performed. No <br /> warranty or guarantee, expressed or implied, is part of the services offered by this <br /> proposal. <br /> The safety of our employees is of paramount concern to Kleinfelder. You will be <br /> notified if the location of your project represents a potential safety concern to our <br /> employees. Unsafe conditions for field work will require a modification of our estimated <br /> scope of work and associated fees. We will advise you of the additional costs <br /> necessary to mitigate these unanticipated conditions, if applicable. <br /> 48093.E01/ST010R109 Page 6 of 6 March 26, 2010 <br /> Copyright 2010 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.