My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 7:55:32 PM
Creation date
9/19/2019 8:51:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505946
PE
2227
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK AND SECONDARY CONTAINMENT ASSESSMENT <br />This document was prepared for: <br />California Tank Lines, Inc. <br />3105 S. El Dorado Street <br />Stockton, CA 95206 <br />Tank/system identification: <br />RECEIVED <br />MAY 2 6 2011 <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />Two 10,300 gallon and two 5100 gallon storage tanks for wastewater. The tanks <br />are installed in three connected containment areas along with two unused cone <br />bottom tanks. As of the date of this assessment, only one 10,300 gallon tank is <br />being used to store wastewater in the pretreatment system. <br />Date of inspection(s)/assessment: <br />The tanks and containment areas were inspected on August 26, 2008, following <br />installation of seismic restraints, and again on June 29, 2010, following <br />modifications to the piping system to create three connected containment areas. <br />The tank and containment assessment was completed on July 7, 2010, and revised <br />May 24, 2011. <br />This report consists of A6 pages. <br />I certify under penalty of law that this document and all attachments were prepared under <br />my direction or supervision in accordance with a system designed to assure that qualified <br />personnel properly gather and evaluate the information submitted. Based on my inquiry <br />of the person or persons who manage the system, or those persons directly responsible for <br />gathering the information, the information is, to the best of my knowledge and belief, <br />true, accurate, and complete. I am aware that there are significant penalties for submitting <br />false information, including the possibility of fine and imprisonment,for_knowing <br />violations. <br />Engineer's name Guy W. Roy <br />1 ` I <br />License Number CH 3187 <br />License Type <br />Address of Engineer <br />City, State Zip <br />Chemical Engineer <br />596 Indian Home Road <br />Danville, CA 94526 <br />3f��f/Z <br />Date starriped/signed:. July 7, 2010. <br />California Tank Lines, Inc. Wastewater Storage Tanks (4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.