Laserfiche WebLink
MIKE SMITH ENGINEEKwiG - 4 NORTH MAIN STREET - LODI_ CA -..224n - t2nm IIA -9119 q16 <br />Anchor Bolt Design <br />Project: <br />California Tank <br />Lines <br />10,300 Gal Tank <br />JJob No.: <br />11071 <br />Date: 5-24-11 <br />Anchor Bolt Data <br />Load Data <br />Seismic DesignCategory: <br />D <br />Seismic Risk Reduction Factor= <br />0.75 <br />Case: Dead+(Live, Wind, EQ) = Wind <br />Anchor Bolt Data: <br />Number of bolts, n = <br />Bolt diameter, D = <br />1` <br />19'_ (in) <br />Maximum tensile reaction, T = 8 (kips) <br />Maximum horizontal react., V =���: (kips) <br />Effective Bolt Area (Table 34-2), A Se = 0.462 (int) <br />Anchor Bolt Shear Strength <br />"Simpson" IXP Anchor Bolt ASTM: <br />A193, Gr B7 <br />Specified Tensile Strenqth, f_, _y. <br />Oay''(ksi) <br />Based on steel strength: <br />Length of embedment, h a, _ <br />Spacing Btwn Bolts, dX = <br />(in) <br />(in) <br />Strength reduction factor, = 0.65 <br />= 45.05 <br />SVS = 0.60 n Ase FS(kips) <br />D <br />Spacing Btwn Bolts, d„ _ <br />(in) <br />Concrete Breakout Strength <br />Minimum edge distance, ex = <br />Minimum edge distance, e,, _ <br />y(in) <br />(in) <br />Strength reduction factor, = 0.70 <br />Shear Failure Surface Area, _ <br />A „� = (eX+dX+1.5eX)*(1.5e)J = 1437.8 (in2) <br />Projected Failure Area for One Bolt, <br />Anchor Bolt Tensile Strength <br />Tensile Strength Reduction, = 0.75 <br />�Nsa = ( � n Fs) = <br />0.75�Nsa = <br />86.63 (kips) <br />64.97 (kips) <br />A „�o = 4.5(eX) 2 = 1458.0 (in) <br />Check: A v, - n A „,, < 1.0 0.49 OK <br />OK <br />Tec,v (no eccentricity) = <br />Ted,v (edge distance modifier) _ <br />= 0.7+0.3(eX/1.5eJ j, � s <br />`f,v (crack concrete modifier) _ <br />Concrete Breakout Strength <br />Concrete Comp. Strength, f, = 2500 (ksi) <br />Strength reduction factor, = <br />0.65 <br />For Single Anchor Shear Strength, Vb <br />Failure Surface Area, ANS = <br />V,, = 7(/e/D)0.200.5)(f^0.5)(e_'.5) = 37.90 (kips) <br />(eX+dX+1.5hef)*(e,+d,+1.5hef) = <br />951.75 (in2)For <br />Two Anchors Strength Near Edge, �V h <br />Projected Failure Area for One Bolt, <br />OV cb, = Avc/Av.* (Tec.v)(ed,v)(Tc,v) ub = <br />A .,.,, = 9(h <,) 2 = <br />324 (in2)23.54 <br />(kips) <br />Check: A Nc - n A Nco < 1.0 <br />N (no eccentricity) <br />1.47 NG <br />For Anchor Group Breakout Shear Stren th, <br />(kips) <br />T,d N (edge distance modifier) = <br />= 0.7 + 0.3(eX/1.5hef) = <br />V rt`' <br />Concrete Pryout Strength <br />T".N (crack concrete modifier) _ <br />Tcn N (cast -in-place anchors) ='` <br />kip = 2.0 for hef > 2.5 in. 2.0 <br />kc (effectiveness factor) _ <br />Ncba = ANc/AN.* (Tec,N)(Ted.N)(wc,N)(Tc,.N) Nb - <br />N,, = k,.A (F,) '12 h e,1-5 = <br />�NcbC - W ANc/ANao* (Tec.N)(Ted.N)(Tc,N)('F <br />12.5 (kips) <br />N) Nb - <br />31.01 (kips) <br />47.71 (kips) <br />$Vrna - krn Nrh. _ 66.79 (kips) <br />Combined Tension and Shear <br />OK <br />(T/�Nn)+(V/$Vn): 1.2 = 0.47 OK <br />Concrete Pullout Strength <br />N p = (Bond strength, per Simpson) _ <br />v�� 3 <br />' (kips) <br />USe: <br />OK <br />2_7/.,,6 x 6" Min Embed F1554 Threaderd Rod <br />Epoxy Anchors <br />Design by: Mike Smith Engineering <br />