My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 7:55:32 PM
Creation date
9/19/2019 8:51:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505946
PE
2227
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA TANK LINES, INC. <br />WASHRACK MAINTENANCE LOG <br />M 0 NT 11 OF Atlll� I ) 7-'? t") <br />DAILY <br />1 <br />— <br />2 <br />3 4 <br />5 <br />6 7 8 <br />9 <br />la 1112 <br />13 <br />14 15 <br />16 <br />- <br />17 <br />- <br />13 <br />19 120121122 <br />23 <br />24 <br />25 26 <br />27 <br />28 29 <br />30 <br />31 <br />Check pumps for proper operation <br />r <br />2, <br />Cheek caustic; and acid tanks <br />Check grease separator and (10W <br />rate <br />Check storage tanks and all piping <br />for leaks <br />CIL-an PH probes <br />Check Safely Gear <br />Clean ,& Check- all Eye Wash and <br />Safely Showers <br />K' <br />Cleaned Containment Area <br />WEEKLY <br />Mean grease separator <br />Calibrate Oxygen Monitor <br />Clean solids from PH adjusting <br />-------- <br />1411 <br />Clean & Calibrate PH probes - <br />Tuesday Thursday &Saturday <br />lec <br />REPAIRS <br />COMMENTS TS <br />METHOD OF CALIB RA TING <br />STEP l' - Begin wilh PH7 solution, let probe remain in solulloll for approximately 15 n1jrILRLS, Of <br />Until a stable reading is c)blainedl. <br />STEP 11 - Sam a as above with PH4 solution, <br />ISTEP III - Same as above with PH" D solution.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.