Laserfiche WebLink
CALIFORNIA TANK LINES, INC. <br />WASHRACK MAINTENANCE LOG <br />MONTH OF -,. Y <br />DA11_Y <br />1 <br />2 <br />3 <br />45 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 13 <br />14 <br />15 1G <br />17 <br />18 <br />19 20 <br />21 <br />22 <br />23 <br />2d <br />23 <br />?6 <br />27 <br />2f3 <br />29 <br />Check purnps for proper operaliorl <br />Check „ausllc and acid tanks <br />Check <br />�� <br />,;� <br />J � <br />_�� <br />"•,, <br />� <br />� <br />��� <br />t <br />l <br />grease separator and flows <br />rale <br />f� <br />Check storage larks and a;l pipilag <br />for leaks <br />Clean PH probes <br />= <br />` / <br />!f^�–Lx <br />Check Safety Gear <br />Clean <br />;, <br />y <br />' <br />&Check art Eye 4vasli and <br />Safety Showers <br />y <br />Cleaned Containment area <br />mow•._ <br />'' <br />+ <br />f <br />WEEKLY <br />Clean grease separator <br />I <br />Calibrate Oxygeli'�4cnlro+ <br />Clean solids trorn PH adjustrng <br />— <br />l <br />lank <br />Clean 8 Calibrate PH probes -r <br />t <br />Tuesday Tnursda Sal <br />REPAMS <br />COMMENTS <br />METHOD OF CALIBRATING <br />STEP I Begin with PH7 Solution, <br />let probe remain in solution for approximately <br />15 minutes, <br />or <br />until: a stable reading <br />is obtained. <br />STEP II - Same as above with <br />PH4 solution <br />STEP III -'Same as above with <br />PH10 safution, <br />I <br />�� a <br />