Laserfiche WebLink
- <br /> V1 W W IIA <br /> r <br /> t <br /> MLAR <br /> 5 <br /> 1 2 3 <br /> '^fur <br /> - <br /> 'J:a <br /> 5e 6 <br /> NO <br /> t -._..,. <br /> 4 7 8 <br /> 1. New motor control centers were provided and new pumps,compressors,valves, <br /> in the South Electrical Room. An existing and piping. <br /> vacant building was converted.to house <br /> this equipment. 5. New chlorination and dechlorination <br /> equipment was installed in the existing <br /> 2. New centrifugal blowers were installed chlorination building,and new bulk <br /> to provide air to the aeration basins. A chemical storage facilities were added. <br /> computer controlled inlet butterfly valve <br /> throttles intake air to match blowers 6. New chemical feed piping was provided <br /> with process demands. to serve new facilities. <br /> 3. primary sludge and scum pumps were 7. Return activated sludge pumps,installed <br /> installed in the new Primary Sludge Pump in the new secondary sludge pump station, <br /> Room adjacent to the new primary sedi- are flow paced by the plant influent flow. <br /> mentation basins. <br /> 8. Control Building improvements included <br /> 4. Improvements to the digester complex a new entryway,new conference/training <br /> included a new 45 ft diameter digester; room,remodeled locker rooms and <br /> repairs to existing floating digester covers; HVAC equipment. <br />