My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2200 - Hazardous Waste Program
>
PR0517537
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 10:47:01 AM
Creation date
9/25/2019 4:21:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517537
PE
2220
FACILITY_ID
FA0009474
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CNTRL
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"� tiv y m .pli RECYCLING AND REUSE <br /> The current discharge permit issued by the Central <br /> Valley Regional Water Quality Control Board to the <br /> City of Lodi is structured to encourage land <br /> application of domestic effluent,as mandated by the <br /> Delta Basin Plan. The City owns in excess of 1000 <br /> acres of land and leases over 900 acres to local farmers <br /> for the cultivation and harvesting of alfalfa,pasture, <br /> and feed corn. The plant has the flexibility to irrigate <br /> domestic flow and digested sludge to the cropland or <br /> to store and re-treat should process upsets occur. <br /> 7' <br /> WATER QUALITY MONITORING <br /> The City has a fully equipped,state-certified laboratory which is <br /> involved in every phase of wastewater treatment from process <br /> control and pretreatment sampling to final effluent discharge <br /> monitoring. The staff tests wastewater samples for various kinds of <br /> organisms and toxic concentrations that may be present in the water. - <br /> The staff also aids plant operations personnel by identifying process <br /> upsets and providing guidance to change operating parameters. <br /> OPTIMIZING OPERATIONS <br /> The experienced plant operations staff administers the day-to-day - - <br /> control of the White Slough facility. Plant operations are monitored <br /> and recorded from the Main Indicating Panel located in the Control <br /> Building. All of the processes,support systems,and equipment <br /> associated with the plant are,to varying degrees,operated and <br /> controlled automatically. The operating status of all processes and _ <br /> major equipment is transmitted to the Control Building and <br /> displayed in the Main Indicating Panel.To attain and maintain <br /> treatment performance requirements,to ensure the normal fife REMENE mom <br /> expectancy of equipment and structures,and too optimize operation <br /> ��®!�® ®�� <br /> Y a <br /> P q P P <br /> and maintenance costs requires the constant attention of skilled m ®_ <br /> W.MMME me <br /> personnel knowledgeable in a variety of disciplines. The White NOWMA Mg4 (a°*y;.� o <br /> Slough staff meets the always challenging wastewater treatment 1000 i's M r <br /> demands of a growing Central Valley community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.