Laserfiche WebLink
WorleyParsons <br /> resources&energy <br /> Site Class C <br /> Seismic Design Category is assigned to each <br /> Seismic Design Category(Table 1613.5(1)and structure based on its Occupancy Category and <br /> (2)) the severity of the design earthquake ground <br /> motion at the site. <br /> Spectral Response Acceleration SDs(Table <br /> 1613.5(1)and(2)) 0.5 <br /> Response Modification Factor, R(ASCE 7-05, 2.5 <br /> Table 13.6-1) <br /> Seismic Importance Factor, 1 1.25 <br /> 1.5 Air Emission Limitations <br /> The plant design is based on being able to meet the proposed emission limits for <br /> the CTG/SCR as provided in the Air Quality section of the Application for <br /> Certification. <br /> 1.6 Fuel Gas <br /> Pipeline-quality natural gas will be provided by PG&E, with site-specific tie in <br /> points to be determined. The gas piping from the gas utility interconnection point <br /> to the generating equipment will be part of power plant design and construction <br /> scope. <br /> 1.7 Water Supply <br /> 1.7.1 Raw Water Supply <br /> Raw water for each site will be "Title 22" water obtained from the City of Lodi <br /> White Slough Water Pollution Control Facility (WPCF) located adjacent to the <br /> power plant. <br /> 1.7.2 Plant Wastewater <br /> Facility waste water streams from the water treatment, the oily water separator, <br /> evaporative cooler, HRSG drum blow downs make are transferred to the cooling <br /> tower. Cooling tower blow down is then injected into the injection well. <br /> 1.7.3 Stormwater Runoff <br /> By design the storm water will be sent to the WPCF via various sump pumping <br /> stations through out the facility. <br /> Lodi Energy Center 3.1 -5 LEC AFC <br /> 071708 Rev.A <br />