My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WorleyParsons <br /> resources&energy <br /> 1.8 Noise Limits <br /> Project far field noise levels will meet local ordinance requirements of 60 dBA at <br /> the property line of the facility. Equipment noise mitigation features will be <br /> accounted for in the plant design as required to meet LORS. <br /> 1.9 Subsurface Conditions <br /> It is not expected that hazardous materials will be encountered during site <br /> excavation as the site has been primarily used for agriculture. Full subsurface <br /> conditions can be found in the Site Geotechnical Report. <br /> 1.10 Electrical/ Communication Interconnection <br /> 1.10.1 Permanent Electric Power Export and Backfeed <br /> The facility will be connected to the electric utility system through high voltage <br /> (HV), circuit breakers and disconnect switches located adjacent to the associated <br /> GSUT. During facility startup and shutdown, the power required for the facility <br /> electrical auxiliary systems will be backfed from the utility system through the <br /> GSUT. <br /> 1.10.2 Stand-by Electric Power <br /> Stand-by electric power of will be provided from the neighboring STIG plant via <br /> a 12kV interconnect. <br /> 1.10.3 Communications <br /> Telephone and communication links between the facility and utility, the fuel <br /> supplier, and other outside parties will be provided by Owner. Appropriate <br /> interface will be provided in the final Plant Design. <br /> 1.11 Codes, Standards, and Specifications <br /> The building code for the project location is the 2007 version of the California <br /> Building Code (CBC). <br /> The following codes, standards, and specifications of U.S. organizations will be <br /> consulted to establish a basis for quality and safety in facility design and <br /> operation. Systems and equipment will be designed in accordance with the latest <br /> edition and addenda in effect at the date of contract execution, unless noted <br /> otherwise. <br /> Lodi Energy Center 3.1 -6 LEC AFC <br /> 071708 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.