® WorleyParsons <br /> resources&energy <br /> baked-on finish. <br /> The wall system will be designed to withstand the specified wind loading, with practical <br /> and equally spaced support girts. <br /> Exterior panel surfaces exposed to weather will be oil coated with Hylar/Kynar 500 or <br /> equivalent finish. The interior surface of the exterior panels will be finished with the <br /> manufacturer's standard baked-on enamel finish. <br /> The siding finish color will be selected from the manufacturer's standard colors to closely <br /> match the existing STIG plant colors... <br /> Wall insulation will be noncombustible glass fiber or mineral wool to produce a minimum <br /> U-factor of 0.08 Btu/hr/ft2/°F. Insulated metal panels will contain non-combustible <br /> insulation or listed as Class 1 or Class A per Factory Mutual Guide or UL listing. <br /> 2.4.5.3 Doors, Frames, and Hardware <br /> Exterior personnel doors will be flush, hollow metal on pressed steel doorframes complete <br /> with windows, hinges, locksets, closers, weather-stripping, and accessory hardware. Fire <br /> doors and frames will conform to NFPA No. 80 for the class of door furnished. <br /> 2.5 Painting and Coatings <br /> 2.5.1 Equipment Painting <br /> The painting and coatings will be applied by a contractor that is SSPC - QP1 qualified. <br /> The Contractor will perform coating or painting of all areas intended for coating or paint <br /> application as described below. <br /> The following equipment and structures will be finish painted following installation <br /> except those that are indicated as shop finished below: <br /> - Power island equipment; main and unit auxiliary transformers (shop finished) <br /> - All field erected tanks (bolted tanks are shop finished) <br /> - Uninsulated shop fabricated tanks (shop finished) <br /> - Electrical cabinets and panels (shop finished) <br /> - All carbon steel, such as valves, shop coated tanks, electrical junction boxes, etc. <br /> - All uninsulated carbon steel pipes will be primed and final coated. <br /> - Concrete secondary containment surfaces (including over curb edges) <br /> Off the shelf components such as motor control centers, control boxes, motors, fans, <br /> valves, hangers, etc. will receive vendor's "Standard Shop Finish". The CTG and STG <br /> will have compatible alkyd enamel finish over supplier standard primer after touch up in <br /> the field. <br /> Lodi Energy Center 3.2- 12 LEC AFC <br /> 071608 Rev.A <br />