Laserfiche WebLink
SECTION 3.0:ELECTRIC TRANSMISSION <br /> TABLE 3.5-6 <br /> Fire Hazard LORS <br /> LORS Applicability <br /> 14 CCR Sections 1250-1258, "Fire Provides specific exemptions from electric pole and tower <br /> Prevention Standards for Electric Utilities" firebreak and electric conductor clearance standards, and <br /> specifies when and where standards apply. <br /> ANSI/IEEE 80, "IEEE Guide for Safety in AC Presents guidelines for assuring safety through proper <br /> Substation Grounding" grounding of AC outdoor substations. <br /> GO-95, CPUC, "Rules for Overhead Electric CPUC rule covers all aspects of design, construction, operation, <br /> Line Construction,"Section 35 and maintenance of electrical transmission line and fire safety <br /> (hazards). <br /> 3.5.7 Jurisdiction <br /> Table 3.5-7 identifies national, state, and local agencies with jurisdiction to issue permits or <br /> approvals,conduct inspections, or enforce the above-referenced LORS. Table 3.5-7 also <br /> identifies the responsibilities of these agencies as they relate to the construction, operation, <br /> and maintenance of the LEC. <br /> TABLE 3.5.7 <br /> National,State,and Local Agencies with Jurisdiction over Applicable LORS <br /> Agency or Jurisdiction Responsibility <br /> FAA Establishes regulations for marking and lighting of obstructions in <br /> navigable airspace (AC No. 70/7450-1G). <br /> Caltrans Department of Aeronautics Grants permits to private heliports in California. May advise local <br /> jurisdictions regarding obstructions to helicopter navigation. <br /> CEC Jurisdiction over new transmission lines associated with thermal <br /> power plants that are 50 MW or more (Public Resources Code[PRC] <br /> 25500). <br /> CEC Jurisdiction of lines out of a thermal power plant to the <br /> interconnection point to the utility grid (PRC 25107). <br /> CEC Jurisdiction over modifications of existing thermal power plants that <br /> increase peak operating voltage or peak kilowatt capacity 25 percent <br /> (PRC 25123). <br /> CPUC Regulates construction and operation of overhead transmission lines. <br /> (General Order No. 95) <br /> CPUC Regulates construction and operation of power and communications <br /> lines for the prevention of inductive interference. (General Order <br /> No. 52) <br /> Local Electrical Inspector Jurisdiction over safety inspection of electrical installations that <br /> connect to the supply of electricity(NFPA 70). <br /> City of Lodi Establishes and enforces zoning regulations for specific land uses. <br /> Issues variances in accordance with zoning ordinances. <br /> Issues and enforces certain ordinances and regulations concerning <br /> fire prevention and electrical inspection. <br /> SAC/371322/082350006(LEC_3.0_ELECTRANS.DOC) 3-13 <br />