Laserfiche WebLink
Pacific Gas and <br /> Electric Company` <br /> Wholesale Marketing & 245 Marke Street <br /> Business Development San Franci.co, CA 941051702 <br /> Mailing Address <br /> Mail Code IJ15A <br /> Pacific Gas and Electric Company <br /> P 0. Box 7 70000 <br /> San Francisco, CA 94177-0001 <br /> Via Mail and Email <br /> 415.973.71100 <br /> Fax:415.9'3.0881 <br /> July 16, 2008 <br /> Mr. Ed Warner <br /> Project Manager <br /> Northern California Power Agency <br /> 180 Cirby Way <br /> Roseville, Ca 95678 <br /> Subject: Request for a Preliminary Application for Gas Service — NCPA Lodi <br /> Energy Center <br /> Dear Mr. Warner: <br /> Pursuant to Northern California Power Agency's (Applicant) request, Pacific Gas <br /> & Electric Company (PG&E) provides Applicant with a response to its request for <br /> a Preliminary Application for Gas Service for the proposed Lodi Energy Center <br /> (Facility) to be located at 12751 North Thornton Road, Lodi, San Joaquin County, <br /> California. This review is based upon a requested gas service date of January 1, <br /> 2011, for a gas load of 2,035 MMBTU/Hr year round at a requested gas delivery <br /> service gas pressure of 720 psig. <br /> At no time does PG&E guarantee pressures above that which is specified in <br /> PG&E's Gas Rule 2 (7-inches water column). The pressures provided herein are <br /> based on computer models, which contain various assumptions and <br /> uncertainties, and therefore represent our best estimate of expected pressures <br /> available on your requested service date. The studies provided herein are based <br /> upon PG&E's current plans for the future design and operation of its gas <br /> transmission systems and existing residential load forecasts, but does not <br /> include any commercial or industrial loads that may request service from our <br /> system. Any change in the Applicant's requested gas loads, the way PG&E <br /> operates its gas system, or PG&E's customer load forecasts and investment <br /> plans may impact the pressures provided herein. Applicant is responsible for any <br /> changes required to their operations or equipment, now or in the future, due to <br /> lower delivery pressures from PG&E than stated herein. PG&E encourages the <br /> Applicant to request updated studies to ensure the information provided herein is <br /> still valid. <br />