My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ed Warner <br /> July 16, 2008 <br /> Page 2 <br /> Standard Facilities: <br /> PG&E proposes to tap its Line 108 near West Armstrong Road, Lodi, and install <br /> approximately 2.8 miles of 6-inch steel pipeline to a 16-inch ultrasonic meter set <br /> located at the Applicant's Facility. Of the 2.8 miles of pipe Applicant will be <br /> responsible for cost for approximately 2.1 miles of the pipeline. PG&E estimates <br /> this design can provide Applicant with a minimum floating delivery pressure of <br /> 110 psig as measured immediately downstream of the meter set. In addition, <br /> PG&E will need to reinforce its system by: <br /> • Installing a new mainline valve and SCADA on Line 108 at Armstrong Road, <br /> • Advance regulator station upgrades at Coffee & Claratina, Claus & Yosemite, <br /> and Sante Fe & Claus from 2013 to 2011 , <br /> • Advance Line 108 connection to L-401 at Vernalis from 2011 to 2010. <br /> • Assumes replacement of 2.5 miles of L-108 of 16-inch with 24-inch pipe is <br /> complete by 11/1/2012. Should PG&E not require this 2.5 miles of pipeline <br /> replacement by the time needed to serve the Applicant's gas demand, it will shift <br /> the costs, or a portion thereof, from PG&E to the Applicant. <br /> Special Facilities: <br /> 240 psis Alternative: In order to provide Applicant with an elevated service <br /> delivery pressure of 240 psig at the inlet to the meter set, PG&E would increase <br /> the diameter of the 2.8 miles of steel pipeline from 6-inch to12-inches, and <br /> perform the above mentioned system reinforcements. <br /> 360 psiq Alternative: In order to provide Applicant with an elevated service <br /> delivery pressure of 360 psig at the inlet to the meter set, PG&E would <br /> • Increase the diameter of the 2.8 miles of steel pipeline from 6-inch to12- <br /> inches <br /> • Uprate L-108 to 720 psig between Ripon-Modesto Meter Station and Eight <br /> Mile Road, <br /> • Install a PLS at Eight Mile Road to limit pressure between Eight Mile Road <br /> and West Armstrong Road to 412 psig. <br /> • Perform the above mentioned system reinforcements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.