Laserfiche WebLink
INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> LODI ENERGY CENTER <br /> Attachment A <br /> Interconnection Facilities <br /> Study Agreement <br /> INTERCONNECTION CUSTOMER SCHEDULE ELECTION FOR CONDUCTING THE <br /> INTERCONNECTION FACILITIES STUDY <br /> The ISO shall use Reasonable Efforts to complete the study and issue a draft <br /> Interconnection Facilities Study report to the Interconnection Customer. Prior to issuing <br /> draft study results to the Interconnection Customer, the Participating TO and ISO shall <br /> share results for review and incorporate comments within the following number of days <br /> after of receipt of an executed copy of this Interconnection Facilities Study Agreement: <br /> [�- one hundred twenty (120) Calendar Days with no more than a +/- 20 <br /> percent cost estimate contained in the report, or <br /> ❑ two hundred ten (210) Calendar Days with no more than a +/- 10 percent <br /> cost estimate contained in the report. <br /> 9 <br />