My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> LODI ENERGY CENTER <br /> Attachment B <br /> Interconnection Facilities <br /> Study Agreement <br /> DATA FORM TO BE PROVIDED BY THE INTERCONNECTION CUSTOMER <br /> WITH THE INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> Provide two copies of this completed form and other required plans and diagrams <br /> in accordance with Section 8.1 of the LGIP. <br /> Provide location plan and one-line diagram of the plant and station facilities. For staged <br /> projects, please indicate future generation, transmission circuits, etc. <br /> One set of metering is required for each generation connection to the new bus or <br /> existing ISO Controlled Grid station. Number of generation connections: One <br /> On the one line indicate the generation capacity attached at each metering location. <br /> (Maximum load on CT/PT) 1,See Attached One line <br /> On the one line indicate the location of auxiliary ower. Minimum load on CT/PT <br /> See Attached One line-Aux power only used for critical loads during plant downtime <br /> _ Will an_alter_nate.source of-auxi.l.ia.ry_powe.r._b.e_auailable during_CTIPT maintenance? <br /> 0 Yes ❑ No <br /> Will a transfer bus.on the generation side of the meterin require that each meter set be <br /> designed for the total plant generation? ❑ Yes X� No <br /> (Please indicate On One line). Only single meter set for total plant generation.All generation is through a <br /> single 3 winding stepup transformer <br /> What type of control system or PLC will be located at the Interconnection Customer's <br /> Large Generating Facility? <br /> Not Determined <br /> What protocol does the control system or PLC use? <br /> Not Determined <br /> Please provide a 7.5-minute quadrangle of the site. Sketch the plant, station, <br /> transmission line, and property line. <br /> See attached General Arrangement <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.