Laserfiche WebLink
INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> LODI ENERGY CENTER <br /> Attachment B <br /> Interconnection Facilities <br /> Study Agreement <br /> DATA FORM TO BE PROVIDED BY THE INTERCONNECTION CUSTOMER <br /> WITH THE INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> Provide two copies of this completed form and other required plans and diagrams <br /> in accordance with Section 8.1 of the LGIP. <br /> Provide location plan and one-line diagram of the plant and station facilities. For staged <br /> projects, please indicate future generation, transmission circuits, etc. <br /> One set of metering is required for each generation connection to the new bus or <br /> existing ISO Controlled Grid station. Number of generation connections: One <br /> On the one line indicate the generation capacity attached at each metering location. <br /> (Maximum load on CT/PT) 1,See Attached One line <br /> On the one line indicate the location of auxiliary ower. Minimum load on CT/PT <br /> See Attached One line-Aux power only used for critical loads during plant downtime <br /> _ Will an_alter_nate.source of-auxi.l.ia.ry_powe.r._b.e_auailable during_CTIPT maintenance? <br /> 0 Yes ❑ No <br /> Will a transfer bus.on the generation side of the meterin require that each meter set be <br /> designed for the total plant generation? ❑ Yes X� No <br /> (Please indicate On One line). Only single meter set for total plant generation.All generation is through a <br /> single 3 winding stepup transformer <br /> What type of control system or PLC will be located at the Interconnection Customer's <br /> Large Generating Facility? <br /> Not Determined <br /> What protocol does the control system or PLC use? <br /> Not Determined <br /> Please provide a 7.5-minute quadrangle of the site. Sketch the plant, station, <br /> transmission line, and property line. <br /> See attached General Arrangement <br /> 10 <br />