My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> LOD[ENERGY CENTER <br /> Physical dimensions of the proposed interconnection station: <br /> 1947741 1 <br /> Bus length from generation to interconnection station: <br /> 1088' <br /> Line length from interconnection station to the Participating TO's transmission line. <br /> F7TO TO is located on premises <br /> Tower number observed in the field. (Painted on tower leg)* <br /> Number of third party easements required for transmission lines*: <br /> *To be completed in coordination with the Participating TO or ISO. <br /> Is the Large Generating Facility in the Participating TO's service area? <br /> Yes ❑ No <br /> Local service provider for auxiliary and other power:iPacific Gas and Electric <br /> Please provide proposed schedule dates: <br /> Begin Construction Date: Jan 2010 <br /> Generator step-up transformer <br /> receives back feed power Date:INov 2011 <br /> Generation Testing Date]Jan 2012 <br /> Commercial Operation Date:1Apr 2012 <br /> Level of Deliverability: Choose one of the following: <br /> ❑ Deliverability with no Network Upgrades <br /> 0 100% Deliverability <br /> I . <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.