Laserfiche WebLink
i <br /> INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> LOD[ENERGY CENTER <br /> Physical dimensions of the proposed interconnection station: <br /> 1947741 1 <br /> Bus length from generation to interconnection station: <br /> 1088' <br /> Line length from interconnection station to the Participating TO's transmission line. <br /> F7TO TO is located on premises <br /> Tower number observed in the field. (Painted on tower leg)* <br /> Number of third party easements required for transmission lines*: <br /> *To be completed in coordination with the Participating TO or ISO. <br /> Is the Large Generating Facility in the Participating TO's service area? <br /> Yes ❑ No <br /> Local service provider for auxiliary and other power:iPacific Gas and Electric <br /> Please provide proposed schedule dates: <br /> Begin Construction Date: Jan 2010 <br /> Generator step-up transformer <br /> receives back feed power Date:INov 2011 <br /> Generation Testing Date]Jan 2012 <br /> Commercial Operation Date:1Apr 2012 <br /> Level of Deliverability: Choose one of the following: <br /> ❑ Deliverability with no Network Upgrades <br /> 0 100% Deliverability <br /> I . <br /> 11 <br />