Laserfiche WebLink
INTERCONNECTION FACILITIES STUDY AGREEMENT,ATTACHMENT C <br /> LODI ENERGY CENTER <br /> 2. Study Fee <br /> The estimated study fee is $150,000 for performing the IFAS. The final <br /> cost to complete the IFAS will be based on actual cost. A $100,000 <br /> deposit will be needed when the Interconnection Customer returns the <br /> signed IFASA to CAISO. <br /> CAISO will provide the IC a record of actual costs for performing the <br /> IFAS. CAISO will invoice the IC the remaining balance if the actual cost is <br /> higher than the collected deposit. If the actual cost is less than the <br /> collected deposit, CAISO will refund the balance to the IC. <br /> 3. Schedule <br /> In order to comply with the recent CAISO GIPR filling with FERC, PG&E will <br /> provide a draft IFAS report to CAISO by September 15, 2008. CAISO will review, <br /> update if necessary, and issue the draft report to the IC for comments within 15 <br /> calendar days (CD) after receipt from PG&E. The final report will be issued within 7 <br /> CD after receiving comments from the IC. <br /> Per the LGIP, the IC must execute and return the attached IFASA along <br /> with the study deposit of$100,000 within thirty calendar days (CD)from the <br /> receipt of this IFASA. If the IC fails to return an executed IFASA with the <br /> study deposit within 30 CD of receipt, the Project will be deemed withdrawn <br /> and will be processed pursuant to Section 3.8 of the LGIP. <br /> i <br /> i <br /> - 2 <br />