My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCONNECTION FACILITIES STUDY AGREEMENT,ATTACHMENT C <br /> LODI ENERGY CENTER <br /> 7.3 System Protection Analysis <br /> Preliminary system protection requirements will be provided based <br /> on the scope and assumptions outlined in this study plan and <br /> technical information provided by the IC. <br /> 7.4 Reactive Power Deficiency Analysis <br /> With the proposed project included in the system model, CAISO <br /> Category"B"and "C contingencies will be analyzed to identify any <br /> reactive power deficiency: <br /> • Whether the results show voltage drops of 5% or more from <br /> the pre-project levels, or <br /> • Whether the results fail to meet applicable voltage criteria. <br /> A post-transient power flow analysis will be performed, if deemed <br /> necessary, after considering the network topology or power transfer <br /> paths involved when a significant amount of power transfer occurs. <br /> 7.5 Dynamic Stability Analysis <br /> Dynamic stability studies will be conducted using the 2012 Summer <br /> Peak Full Loop Base Case to ensure that the transmission system <br /> remains in operating equilibrium through abnormal operating <br /> conditions after the new facility begins operation. <br /> Disturbance simulations will be performed for a study period of up to <br /> 20 seconds to determine whether the new facility will create any <br /> system instability during the following line and generator outages: <br /> 7.5.1 CAISO Category"B" <br /> • Full load rejection of 280 MW of the Project. <br /> • Three phase fault with normal clearing time at Eight Mile Road <br /> 230 kV bus, Section E,followed by the loss of the Lodi Stig— <br /> Eight Mile Road 230 kV line. <br /> • Three phase fault with normal clearing time at Gold Hill 230 kV <br /> Bus#1, followed by the loss of the Gold Hill—Lodi Stig 230 kV <br /> line. <br /> 7.5.2 CAISO Category"C" <br /> • Three phase fault at Eight Mile Road Substation 230 kV bus, <br /> Section E, with normal clearing time <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.