|
Russell Huddleston
<br /> Project Biologist,California State Highway 12 Roadway Improvement Project,California
<br /> Department of Transportation, Solano County,California.Conducted vernal pool invertebrate
<br /> surveys and wetland delineations for Highway 12 roadway improvement Projects.
<br /> Project Biologist,On-call Environmental Services,Sacramento Municipal Utility District,
<br /> California.Provided a range of environmental services,including wetland delineations,special-
<br /> status species surveys,habitat assessment and compliance monitoring as part of the on-call
<br /> environmental services contract.
<br /> Project Biologist,Forest Highway 114/Hyampom Road Reconstruction,U.S.Federal Highway
<br /> Administration,Trinity County,California.As part of the environmental review process,
<br /> consulted with federal resource agency staff,assisting with rare plant surveys and habitat
<br /> mapping and classification. Habitat types included Douglas-fir forest,oak woodland and
<br /> riparian ecosystems.The U.S. Federal Highway Administration in cooperation with the U.S.
<br /> Forest Service and Trinity County proposed to reconstruct approximately 8.5 miles of Forest
<br /> Highway in Trinity County, California.
<br /> Project Biologist,California-Oregon Border Power Plant,People's Energy Resources,
<br /> Bonanza,Oregon.CH2M HILL was contracted by the California-Oregon Border Power Plant to
<br /> prepare the Site Certificate Application for submittal to the Oregon Office of Energy. Project
<br /> related facilities included a nominal 1,150-megawatt generating facility,a 7.2-mile electric
<br /> transmission line,a 4.1-mile natural gas supply pipeline and a 2.8-mile water supply pipeline.
<br /> Responsible for coordinating with state and federal resources agencies and conduction habitat
<br /> mapping,rare plant surveys,and wetland delineations for the proposed project.Natural habitats
<br /> included sagebrush steppe,juniper woodland,ponderosa pine forest and seasonal wetlands.
<br /> Vegetation within each habitat was characterized and the habitat was evaluated based on the
<br /> Oregon Department of Fish and Wildlife's Habitat Classification System.
<br /> Wetland Ecologist,Sierra Army Depot,U.S.Army Corps of Engineers,Sacramento,
<br /> California.Conducted an assessment of jurisdictional waters of the U.S. (including wetlands) on
<br /> an approximately 110-acre site at the Sacramento Army Depot in southern Sacramento County,
<br /> California.This assessment includes lands to be transferred to the City of Sacramento as part of
<br /> the Base Realignment and Closure Act.
<br /> Wetland Ecologist,State Route 153 Roadway Improvement Project,Federal Highway
<br /> Administration,Beaver,Utah,September 2003.Conducted an assessment of jurisdictional
<br /> waters of the U.S. (including wetlands for approximately 766 acres along Utah State Highway
<br /> 153.Wetland delineation was conducted along 11.5 miles of roadway.
<br /> Botanist,In-Delta Storage Project,California Department of Water Resources,Sacramento
<br /> and Contra Costa Counties.Assisted DWR botanists with rare,threatened and endangered
<br /> plant surveys in the Sacramento-San-Joaquin Delta. Habitat types included inter-tidal areas,
<br /> annual grassland,riparian areas and agricultural lands.
<br /> Project Biologist,Sacramento Municipal Utility District's Cosumnes Power Plant,California.
<br /> Conducted a wetland delineation for the proposed energy facility site,laydown area, and 26-
<br /> 2 SAC/371322
<br />
|