Laserfiche WebLink
Page 3 of 3 <br /> iP- E-mail : MGillett@DTSC.ca.gov <br /> >>> "Haeck, Gary" <Gary.Haeck@stantec.com> 08/24/09 7:34 PM >>> <br /> Maria, I thought you might appreciate this drawing provided by Mike <br /> DeBortoli that depicts with cross-hatching the various preliminary <br /> estimated foundation depths. Per our discussion these depths are <br /> relative to a final finished grade that is going to be achieved by <br /> adding about 4 + feet of fill to the existing site, to bring it above <br /> the 100 year flood datum. Note the small area with a 15-foot bgs <br /> footing depth (again relative to final grade) . <br /> From a risk perspective, this is something we hadn't mentioned, but <br /> whatever impacts are present will be further isolated from exposure by <br /> the additional 4+ feet of fill being brought in to raise the surface <br /> level. Then as discussed, the entire site will be covered with <br /> asphaltic concrete pavement where not covered by the concrete <br /> foundations. <br /> Thanks Gary <br /> Gary D. Haeck, Ph.D. , P.G. <br /> Managing Senior Geologist <br /> Stantec <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Ph: (916) 384-0768 <br /> Fx: (916) 861-0430 <br /> Cell: (530) 400-0362 <br /> Gary.Haeck@Stantec.com <br /> stantec.com <http://www.stantec.com> <br /> 8/26/2009 <br />