Laserfiche WebLink
5.11:SOILS <br /> management practices (BMPs)will be implemented during construction,as described in the <br /> Stormwater Pollution Prevention Plan(SWPPP) that is required for all construction projects <br /> over 1 acre under the general permit covering discharges of stormwater from construction <br /> activities. The California Energy Commission(CEC) also requires that project owners <br /> develop and implement a drainage,erosion, and sediment control plan (DESCP) to reduce <br /> the impact of runoff from a construction site. Therefore,impacts from soil erosion are <br /> expected to be less than significant. Monitoring will involve construction site inspections to <br /> ensure that the BMPs described in the SWPPP/DESCP are properly implemented and <br /> provide an effective combination of erosion and sediment controls. <br /> Despite the low potential for soil erosion in the proposed LEC project area, estimates of <br /> erosion by water and wind are provided in the following sections. <br /> 5.11.2.4.1 Water Erosion <br /> An estimate of soil loss during construction by water erosion was developed using the <br /> Revised Universal Soil Loss Equation(RUSLE2), and is summarized in Table 5.11-2. <br /> Detailed calculations for the soil loss estimates are found in Appendix 5.11A. <br /> TABLE 5.11-2 <br /> LEC Construction Soil Loss Estimates Using the Revised Universal Soil Loss Equationa <br /> Soil Loss Soil Loss Soil Loss <br /> Feature Duration (tons)without (tons) (tons/yr) <br /> (acreage)b Activity (months) BMPs with BMPs No Project <br /> Project Site–(4.4 acres) Grading 2 0.8 0.010 0.0233 <br /> Construction 22 4.1 0.113 — <br /> Laydown Areas(A through D, Grading 1 0.9 0.011 0.0519 <br /> 9.8 acres total) <br /> Construction 23 0.0 0.00 — <br /> Natural Gas Line–(1.25 acre Grading 3 2.50 0.032 0.0482 <br /> for trench)and 9.45 acres for <br /> construction corridor) Construction 3 1.16 0.032 — <br /> Project Soil Loss Estimates 24 9.48 0.20 0.12 <br /> a Soil losses(tons/acre/year)are estimated using RUSLE2 software available online <br /> [http://fargo.nserl.purdue.edu/rusle2–dataweb/RUSLE2–index.html. <br /> b Acreages assume 30-ft corridors for the natural gas construction corridor.Trench for the natural gas pipeline <br /> is assumed to be 4-ft wide. <br /> The following assumptions,which are also shown in Appendix 5.11A,were used in the <br /> model. <br /> • The LEC construction site totals 4.4 acres. Active soil grading will occur over a 2-month <br /> period. The soil in this area will then be exposed for an additional 22 month construction <br /> period, after which the majority of the site will be paved or covered with LEC facilities. <br /> It is assumed that around 1/10thof the project site will have bare soil exposure during <br /> the construction period. <br /> 5.11-8 SAC/371322/082330009(LEC_5.11_SOILS.DOC) <br />