Laserfiche WebLink
5.16 WORKER HEALTH AND SAFETY <br /> TABLE 5.16-2 <br /> Operation Hazard Analysis for the LEC <br /> Activity Hazard" Control <br /> Working on electrical Employee contact with live Electrical Safety Program; PPE <br /> equipment and systems electricity Program <br /> Confined space entry Employee injury from physical and Permit-Required; Confined-Space Entry <br /> chemical hazards Program <br /> General plant operation Employee injuries from hand and Hand and Portable Power Tool Safety <br /> activities portable power tools Program; PPE Program <br /> General plant operation Employee injury and property Housekeeping and Material Handling <br /> activities damage from inadequate walking and Storage Program <br /> and work surfaces <br /> General plant operation Employee overexposure to Hearing Conservation Program; <br /> activities occupational noise PPE Program <br /> General plant operation Employee injury from improper Back Injury Prevention Program <br /> activities lifting and carrying of materials and <br /> equipment <br /> General plant operation Employee injury and property Safe Driving Program <br /> activities damage from unsafe driving <br /> General plant operation Employee overexposure to Hazard Communication Program; <br /> activities hazardous gases,vapors, dusts, Respiratory Protection Program; <br /> and fumes PPE Program; Employee Exposure <br /> Monitoring Program <br /> General plant operation Reporting and repair of hazardous Injury and Illness Prevention Program <br /> activities conditions <br /> General plant operation Heat and cold stress Heat and Cold Stress Monitoring and <br /> activities Control Program <br /> General plant operation Ergonomic injuries Ergonomic Awareness Program <br /> activities <br /> Maintenance and repair of Employee injury and property Pressure Vessel and Pipeline Safety <br /> high-pressure steam and air damage due to failure of Program; Electrical Safety Program <br /> systems pressurized system components or <br /> unexpected release of pressure <br /> Ammonia storage Ammonia release Emergency Action Program/Plan; <br /> Risk Management Plan (RMP) <br /> (see Section 5.5) <br /> The hazard and hazard controls provided are generic to operational activities.This hazard analysis may have <br /> to be updated if plant operations change or new equipment is added that was not considered during this <br /> evaluation. <br /> 5.16.2.3 Training and Safety Programs <br /> To protect the safety and health of workers during the construction and operation of the <br /> LEC, health and safety programs designed to mitigate hazards and comply with applicable <br /> regulations will be implemented. Periodic audits will be performed by qualified individuals <br /> to determine whether proper work practices are being used to mitigate hazardous <br /> conditions and to evaluate regulatory compliance. <br /> SAC/371322/082330005(LEC_5.16_WORKERHEALTHSAFETY.DOC) 5.16-5 <br />