My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.16 WORKER HEALTH AND SAFETY <br /> The following sections contain information on the anticipated content of the health and <br /> safety programs. <br /> 5.16.2.3.1 Construction Health and Safety Program <br /> The following construction safety programs will be developed and implemented during <br /> construction of the LEC as outlined in the following lists. <br /> Injury and Illness Prevention Program <br /> • Philosophy and safety commitment <br /> • Safety leadership and responsibilities <br /> • Accountability <br /> • Specific core safety processes (see Construction Safety Programs later in this section) <br /> • Employee communication <br /> • Planning"job hazard analysis and pre-task' <br /> • Compliance with work rules and safe work practices <br /> • Measurement of compliance and effectiveness of prevention methods,inspections/audits <br /> • Communication of performance and implementation of necessary improvements <br /> • Training and other communication requirements <br /> Fire Protection and Prevention Program <br /> • General requirements <br /> • Housekeeping and proper material storage <br /> • Employee alarm/communication system <br /> • Portable fire extinguishers <br /> • Fixed firefighting equipment <br /> • Fire control and containment <br /> • Flammable and combustible liquid storage <br /> • Dispensing and disposal of flammable liquids <br /> • Service and refueling areas <br /> • Training <br /> Personal Protective Equipment Program <br /> • Personal protective devices <br /> • Head protection <br /> • Eye/face protection <br /> • Body protection <br /> • Hand protection <br /> • Foot protection <br /> • Skin protection <br /> • Fall protection <br /> • High-voltage protection <br /> • Respiratory protection <br /> • Hearing protection <br /> • Hazard analysis <br /> • Training <br /> 5.16-6 SAC/371322/082330005(LEC_5.16_WORKERHEALTHSAFETY.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.