Laserfiche WebLink
CONTENTS <br /> 5.6-2 Williamson Act and Farmland Security Act Status of Parcels Affected by the <br /> ProposedProject.....................................................................................................5.6-6 <br /> 5.6-3 General Plan Land Use Designations and Allowable Uses Within a 1-mile <br /> Radius of the Project...............................................................................................5.6-9 <br /> 5.6-4 Zoning Designations and Allowable Activities Within a 1-mile Radius of <br /> theProject...............................................................................................................5.6-10 <br /> 5.6-5 City of Lodi Recent Proposed Zone Changes and General Plan <br /> Amendments.........................................................................................................5.6-19 <br /> 5.6-6 Project Conformity with Local Land Use Plans and Policies.........................5.6-23 <br /> 5.6-7 Laws,Ordinances,Regulations, and Standards for Land Use.......................5.6-27 <br /> 5.6-8 Agency Contacts and Permit for Land Use.......................................................5.6-28 <br /> 5.7-1 Definitions of Acoustical Terms............................................................................5.7-2 <br /> 5.7-2 Typical Sound Levels Measured in the Environment and Industry...............5.7-3 <br /> 5.7-3 Summary of Hourly Measurements at M1 (dBA)..............................................5.7-7 <br /> 5.7-4 Summary of Hourly Measurements at M2 (dBA)..............................................5.7-8 <br /> 5.7-5 Summary of Hourly Measurements at M3 (dBA)..............................................5.7-9 <br /> 5.7-6 Summary of Hourly Measurements at M4 (dBA)............................................5.7-10 <br /> 5.7-7 Construction Equipment and Composite Site Noise Levels...........................5.7-12 <br /> 5.7-8 Average Construction Noise Levels at Various Distances..............................5.7-12 <br /> 5.7-9 Noise Levels from Common Construction Equipment at Various <br /> Distances................................................................................................................5.7-13 <br /> 5.7-10 Construction Vibrations.......................................................................................5.7-13 <br /> 5.7-11 Summary of Sound Power Levels Used to Model LEC Plant Operations....5.7-15 <br /> 5.7-12 Laws,Ordinances,Regulations,and Standards for Noise..............................5.7-17 <br /> 5.7-13 City of Lodi Land Use Compatibility Guidelines (CNEL)..............................5.7-19 <br /> 5.8-1 Paleontological Sensitivity Ratings Employed...................................................5.8-4 <br /> 5.8-2 Laws,Ordinances,Regulations, and Standards for Paleontological <br /> Resources ...............................................................................................................5.8-10 <br /> 5.8-3 Agency Contacts for Paleontological Resources ..............................................5.8-12 <br /> 5.9-1 Laws,Ordinances,Regulations, and Standards for Public Health..................5.9-2 <br /> 5.9-2 Top Ten TACs Emitted by All Sources in the San Joaquin Valley Air Basin.5.9-9 <br /> 5.9-3 Maximum Construction DPM Emissions..........................................................5.9-11 <br /> 5.9-4 Pollutants Emitted to the Air from Lodi Energy Center.................................5.9-12 <br /> 5.9-5 Toxicity Values Used to Characterize Health Risks.........................................5.9-17 <br /> 5.9-6 Summary of Potential Health Risks...................................................................5.9-17 <br /> 5.9-7 Summary of Potential Cumulative Health Risks .............................................5.9-21 <br /> 5.9-8 Agency Contacts for Public Health....................................................................5.9-21 <br /> 5.9-9 Permits and Permit Schedule for Public Health...............................................5.9-22 <br /> 5.10-1 Historical, Current, and Projected Populations*..............................................5.10-1 <br /> 5.10-2 Historical and Projected Annual Average Compounded Population <br /> GrowthRates.........................................................................................................5.10-2 <br /> 5.10-3 Housing Estimates by City, County, and State,January 1,2008....................5.10-7 <br /> 5.10-4 Employment Distribution in Stockton MSA,2002 to 2007..............................5.10-7 <br /> 5.10-5 Employment Data,2007.......................................................................................5.10-8 <br /> SAC/371322/082490010(LEC_CONTENTS.DOC) A <br />