Laserfiche WebLink
CONTENTS <br /> 5.1-33 District Offset Emission Thresholds...................................................................5.1-52 <br /> 5.1-34 STIG Plant Emissions and PSD Major Source Thresholds..............................5.1-57 <br /> 5.1-35 LEC Proposed Emissions and PSD Major Source Thresholds........................5.1-57 <br /> 5.1-36 Net Emission Increases and Significant Emissions Levels..............................5.1-57 <br /> 5.1-37 PSD Significant Impact Levels (SILs) and Class II Increments.......................5.1-58 <br /> 5.1-38 BACT Required Under Federal PSD for LEC...................................................5.1-58 <br /> 5.1-39 PSD Preconstruction Monitoring Exemption Levels.......................................5.1-59 <br /> 5.1-40 PSD Significant Impact Levels (SILs) and Class II Increments.......................5.1-60 <br /> 5.1-41 Project Impacts to Vegetation and Sensitive Species.......................................5.1-61 <br /> 5.1-42 Compliance With 40 CFR 60 Subpart KKKK....................................................5.1-62 <br /> 5.1-43 Best Available Control Technology Requirements..........................................5.1-66 <br /> 5.1-44 SJVAPCD Offset Requirements and Project Emissions...................................5.1-68 <br /> 5.1-45 Laws,Ordinances,Regulations,Standards, and Permits for <br /> Protection of Air Quality .....................................................................................5.1-71 <br /> 5.1-46 Screening Health Risk Assessment Results.......................................................5.1-75 <br /> 5.1-47 Agency Contacts for Air Quality........................................................................5.1-76 <br /> 5.2-1 Special-Status Species with the Potential to Occur in the Vicinity of the <br /> LodiEnergy Center...............................................................................................5.2-11 <br /> 5.2-2 Wildlife Species Observed during Field Surveys.............................................5.2-17 <br /> 5.2-3 Plant Species Observed During Field Surveys.................................................5.2-18 <br /> 5.2-4 Summary of Potential LEC Impacts on Biological Resources during <br /> Demolition and Construction..............................................................................5.2-24 <br /> 5.2-5 Laws,Ordinances,Regulations, and Standards for Biological Resources....5.2-32 <br /> 5.2-6 Agency Contacts for Biological Resources........................................................5.2-30 <br /> 5.3-1 Cultural Resources Reports within 1 Mile of the LEC.......................................5.3-7 <br /> 5.3-2 Laws,Ordinances,Regulations, and Standards for Cultural Resources......5.3-18 <br /> 5.3-3 Agency Contacts for Cultural Resources...........................................................5.3-21 <br /> 5.4-1 Laws,Ordinances,Regulations, and Standards for Geologic Hazards and <br /> Resources ...............................................................................................................5.4-11 <br /> 5.5-1 Use and Location of Hazardous Materials..........................................................5.5-3 <br /> 5.5-2 Chemical Inventory,Description of Hazardous Materials Stored Onsite,and <br /> Reportable Quantities.............................................................................................5.5-7 <br /> 5.5-3 Toxicity, Reactivity, and Flammability of Hazardous Substances <br /> StoredOnsite.........................................................................................................5.5-11 <br /> 5.5-4 Toxic Effects and Exposure Levels of Regulated Substance...........................5.5-16 <br /> 5.5-5 Laws,Ordinances,Regulations,and Standards for Hazardous Materials <br /> Handling................................................................................................................5.5-28 <br /> 5.5-6 Agency Contacts for Hazardous Materials Handling.....................................5.5-35 <br /> 5.5-7 Permits and Plans Required and Permit Schedule for Hazardous <br /> MaterialsHandling...............................................................................................5.5-36 <br /> 5.6-1 Distance from Project Site to Facility by Facility Type......................................5.6-2 <br /> X SAC/371322/082490010(LEC_CONTENTS.DOC) <br />